The ISOLDE Solenoidal Spectrometer project. Robert Page. The original plan: Move TSR to ISOLDE UK STFC funded project ~£5M investment Internal spectrometer External spectrometer Start January 2015 Completion March 2019. Spectrometer Systems for TSR@ISOLDE. Physics Motivation.
E N D
The ISOLDE Solenoidal Spectrometer project Robert Page
The original plan: Move TSR to ISOLDE UK STFC funded project ~£5M investment Internal spectrometer External spectrometer Start January 2015 Completion March 2019 Spectrometer Systems for TSR@ISOLDE
Solenoidal spectrometer concept vlab v0 θlab θcm z Vcm CM Angle: CM Energy:
Challenges: TSR not in CERN MTP Spectrometer Systems for TSR@ISOLDE
Internal Spectrometer Plan to exploit Si detector system on CRYRING@ESR
Challenges: TSR not in CERN MTP ISS on XT02 beam line No TSR – beam quality (beam manipulation) No funding for magnet Spectrometer Systems for TSR@ISOLDE
Magnet procurement • Magnet available from Brisbane (UQ) • OR66 4T ex-MRI magnet • “Active shield” reduces stray field • Installed February 2003 • Discharged then warmed ~2013 • Funding request (STFC/UoL) June 2015
Magnet procurement • Magnet available from Brisbane (UQ) • OR66 4T ex-MRI magnet • “Active shield” reduces stray field • Installed February 2003 • Discharged then warmed ~2013 • Funding request (STFC/UoL) June 2015 • Magnet ordered November 2015
sailing across the globe… Calicanto Bridge
Preparation & cleaning magnet bore ~90 cm diameter
Cooling down, January 2017 Thanks to CERN cryogenics team, Patrick Retz, ...
Energising, February 2017 ramped up to 2.75 T, held for 1 hour then ramped down
In the ISOLDE Hall ~18 tons – too heavy for ISOLDE hall crane!
Magnetic shielding design Jérémie Bauche, Kevin Buffet & Yacine Kadi (CERN)
ISS Mechanical Design Target & detector drive systems Hexagonal Si tube ~50 cm long 4 DSSDs per face ASIC readout Cooled
ISS Si detector module 6 R3B ASICs 0 – 50 MeV 128 channels 100 MHz time stamp daisy-chained
Si detectors DSSDs: 1 mm thick x: 128 × 0.95 mm y: 11 × 2 mm
132Sn(d,p) with TSR beam quality simulations by Marc Labiche
Reconstructing the z position CM Energy: Algorithm devised by P. Butler Implemented in GEANT4 by M. Labiche
Exploitation plans early exploitation before LS2 stable & long-lived isotope running during LS2 + commissioning of the ISS Si array + commissioning of gas recoil detector… followed by ISS running after LS2
Conclusions • Design work well advanced • First Si DSSDs delivered • Prototype tests under way • Magnet recommissioned • ISOLDE integration continuing