1 / 11

HES HKS meeting

HES HKS meeting. Lady justice. 14/Apr/2011 T.Gogami. 2/Apr/2011, Frankfurt, Germany. Itinerary. Analysis (Tracking). Newport News, US (JLab) 2/01 Narita  US 2/27-28 HES HKS collaboration meeting, 4 th JSPS core to core meeting 3/11 Norfolk  Washington D.C.

delu
Download Presentation

HES HKS meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HES HKS meeting Lady justice 14/Apr/2011 T.Gogami 2/Apr/2011, Frankfurt, Germany

  2. Itinerary Analysis (Tracking) • Newport News, US (JLab) • 2/01 Narita  US • 2/27-28 HES HKS collaboration meeting, 4th JSPS core to core meeting • 3/11Norfolk  Washington D.C. • The Great earthquake news when I woke up! • 3/12 Washington D.C  Frankfurt • Mainz, Germany (Mainz Univ.) • 3/17-18 KaOS meeting in Mainz • Extend to stay in Germany ( 3/214/4 ) • Darmstadt, Germany (GSI) • 3/30 – 4/4 • 4/4 Frankfurt  Narita • Fukushima, Japan • Tokyo(4/5)  Fukushima(4/6) • Sendai, Japan • Fukushima(4/11)  Sendai(4/11) Analysis (Rate , Efficiency), JPS Analysis code , Shift , cabling Meeting, Inside GSI

  3. Contents • KTOF TDC cut test • KDC layer rates output

  4. KDC hit wire selection code KDC1 KDC2 • GREEN regionSelective region • RED markers & linesSelected hit wires • BLACK markers & lines Rejected hit wires

  5. KTOF TDC • Cut 10000 – 50000 (current) 18000 – 20500 (test) Run 76314 for CH2 target Run 77124 for 52Cr target

  6. Results after KTOF TDC cut 2.0 [μA] , CH2 , 76315 7.6 [μA] , 52Cr , 77124 • After TDC cut  Error • Analysis time ~20% reduction

  7. KTOF TDC • Cur Region 2100 – 2400 (Accidental) 2600 – 2800 (signal) Run 76314 for CH2 target Run 77124 for 52Cr target

  8. KDC DC Efficiency Rate

  9. KDC Rate vs. Efficiency • Looks two tendencies • Applied voltages ? • Threshold ? Need to check Run sheet

  10. Summary and to do • Summary • KTOF TDC cut • No bad effects for Number of Kaon • Analysis time is faster • Check sub peaks • Rate vs. Efficiency of KDC • Two tendencies  Check KDC applied voltage and threshold • To do • HES • Tracking • Efficiency, Rate • E01-011 • 授業料免除 • RA • 学振 • 5/6 ----- 8/1 Germany • あと3週間で出発!

  11. End 31/Mar/2011, Darmstadt, Germany

More Related