1 / 1

Tajikistan – 500kV Proposed Transmission Line and Substation Interconnections

500km. Connection to Uzbekistan. Khoujand. Datka Kyrgyzstan. Complete - 280km. Complete - 70km. Line 40% Complete ??? –100km. Regar. Dushanbe. Rogun. Connection to Uzbekistan. Nurek. 150km – not yet funded. 70km. Existing 220kV Line Connections to Nurek and Regar. Fahrabad.

delu
Download Presentation

Tajikistan – 500kV Proposed Transmission Line and Substation Interconnections

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 500km Connection to Uzbekistan Khoujand Datka Kyrgyzstan Complete - 280km Complete - 70km Line 40% Complete ??? –100km Regar Dushanbe Rogun Connection to Uzbekistan Nurek 150km – not yet funded 70km Existing 220kV Line Connections to Nurek and Regar Fahrabad Sangtuda Tajikistan – 500kV Proposed Transmission Line and Substation Interconnections AC/DC Converter 90km 240km Legend Nizhnyi 500kV AC Line Existing 500kV AC Line Future Alternative AC/DC Converter Location 200km 500kV DC Line Future Dustidrum HPP 220kV Line to Pol-e-Khumri Afghanistan 500kV DC Line to Afghanistan

More Related