500km. Connection to Uzbekistan. Khoujand. Datka Kyrgyzstan. Complete - 280km. Complete - 70km. Line 40% Complete ??? –100km. Regar. Dushanbe. Rogun. Connection to Uzbekistan. Nurek. 150km – not yet funded. 70km. Existing 220kV Line Connections to Nurek and Regar. Fahrabad.
E N D
500km Connection to Uzbekistan Khoujand Datka Kyrgyzstan Complete - 280km Complete - 70km Line 40% Complete ??? –100km Regar Dushanbe Rogun Connection to Uzbekistan Nurek 150km – not yet funded 70km Existing 220kV Line Connections to Nurek and Regar Fahrabad Sangtuda Tajikistan – 500kV Proposed Transmission Line and Substation Interconnections AC/DC Converter 90km 240km Legend Nizhnyi 500kV AC Line Existing 500kV AC Line Future Alternative AC/DC Converter Location 200km 500kV DC Line Future Dustidrum HPP 220kV Line to Pol-e-Khumri Afghanistan 500kV DC Line to Afghanistan