140 likes | 384 Views
CDI. Chemical Distribution Institute. INTERTANKO Vetting Seminar London, 2 nd October 2006. CDI - Statistics September 2006. 65 Participants 636 Ship owners 2642 ships on the database 1497 ships active 1533 inspections per year 5367 accesses per year (AR 3.5) 73 Accredited Inspectors.
E N D
CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2nd October 2006
CDI - StatisticsSeptember 2006 • 65 Participants • 636 Ship owners • 2642 ships on the database • 1497 ships active • 1533 inspections per year • 5367 accesses per year (AR 3.5) • 73 Accredited Inspectors
1st April 2007 SIR 6th Edition And ISIS-Web7
SIR 6th Edition - Focus on ‘’physical’’ inspection - Testing for compliance rather than the --existence of now mandated procedures - Crew Matrix - Verification of crew knowledge & proficiency - ER Machinery, lifeboat equipment – random 5 - Guidance notes become living document - Original Protocol, Amendment page, Revision - 3 month validity for gas free ships
ISIS-Web7 - Totally web-based - Reports in Progress, Active Reports – All Go - Ship name (IMO) and User default parameter - print, .pdf, MS Excel, XML - Casualty information - EQUASIS Ship File - MSDS - Ship owner comments page for the ship
www.cdi.org.uk End of Slide Show CDI Chemical Distribution Institute
CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2nd October 2006 Part 2
MRSCDI 2006 August 18th 80 Inspection requests in process today 517 Inspection Requests processed. 95 Cancellations (18%) - change of orders - oil major inspections - ship delayed, inspector released - too short notice - failure to reach agreement 15 complaints 8% increase in negative answers 9% reduction in inspections
5.1 Inspection Fees Inspection fees are not fixed or suggested by CDI-mid. In compliance with EU Competition Law and US Anti-Trust Law, fees are to be agreed between the requesting party and the individual inspector. Under the procedures of Accreditation, ship inspectors are not permitted to collude on inspection fees.
5.5 Rejection of Appointed Inspector In the event that the requesting party and appointed inspector are unable to reach agreement, and based on a declared ‘’motivated reason’’ the requesting party may request a second alternative inspector. The requesting party must then choose between first and second appointments.
www.cdi.org.uk End of Slide Show - again CDI Chemical Distribution Institute