290 likes | 684 Views
In Service Management Combat Training Systems under the conditions of the Transformation and Reorientation of the Bundeswehr. - Reorientation of the Bundeswehr - In Service Management Live – Simulation German Army Combat Training Center / GACTC. LTC Wolfgang Gelpke Dipl.-Ing. , MSc
E N D
In Service ManagementCombat Training Systems under the conditions of the Transformation and Reorientationof the Bundeswehr - Reorientation of the Bundeswehr - In Service Management Live – Simulation German Army Combat Training Center / GACTC LTC Wolfgang Gelpke Dipl.-Ing. , MSc BAAINBw U 6.2
Reorientation of the Bundeswehr Procurement and In-Service Management The amended Customer Product Management Process CPM
The amended CPM Clear Responsibilities Clear decision – making authority Elimination of bureaucracy Reduced interfaces 3 instead of 4 phases -> Provide optimum of support for the Armed Forces The amended CPM is the internal FMOD framework directive for capability-oriented requirement identification, timely and cost-effective procurement of operational products and services, and their efficient use. CPM 12.11.2012
Mission Material responsibility for operational viability Responsibility of the Director of the Federal Office of Bundeswehr Equipment, Information Technology and In-Service Support for the operational viability of products and/or services in the Bundeswehr. This includes Bundeswehr-wide product-related management activities and decisions throughout the procedure that facilitate the safe and appropriate use of products in accordance with their intended purpose as laid down in the agreement on objectives. It begins, as a rule, after the selection of a proposed solution for the capability gap to be closed and ends with the retirement of the product. Responsibility for the operational viability through the whole life-cycle „from the cradle to the grave“
Integrated Project Team - IPT Analysis Phase I Lead : Bundeswehr Planning Office Analysis Phase II Lead : BAAINBw Production Phase Lead : BAAINBw In-Service Phase Lead : BAAINBw
Material Responsibilty Measures to maintain operational viability Product - Modifications Product - Improvements Follow-on supply / spares /replacements Product – maintenance Evaluation and Assessment of In-Service Information Data and Cost evaluation Controlling project elements …
GACTC („GÜZ“) German Army Combat Training Center
Principle of „GÜZ“ GPS position AGDUS TES -laserpulse radio-data situation radio-data – sim-effects video data-network Trng Area radio-network station
Battery recharge unit PDD Battery recharge unit PU Battery testunit Batteryunits NBC-Sensor AP Mine Mounted sensor Mine -Sensor mounted sensor IED G36 OC unit AT Mines G22 Mine detector/activator MG3 callibrating/ adjustment PIP GÜZ C-IED PIP GÜZ Med Interfaces
Innovation 1998 2013 network : 5 -band Min 8 data-standards GPS integrated Weight: 130 g hight:136mm width:70mm depth:8mm Standby 600 h Call time 18 h Features: 12,7 cm (5 inch) HD Display - 16 Mio. colours Quad Core-Processor 16 GB internal memory 13 Megapixel camera ... network:D-Netz 900MHz weight: 203g hight:173mm width:50mm depth:28mm Standby 120 h Call time 10 h Features: Memo Colourdisplay
100% Op. Viability Regeneration Regeneration 2006 2007 2008 2009 2010 2011 2012 2013 Regeneration Cycles
Workstations 2008 1999
Command Center servers network projectors workstations
Obsolescence Obsolescence : crystal-oscillator for AGDUS MG 3 electronics old crystal-oscillator new crystal-oscillator
Implementation of new equipment AGDUS Grenade Machine Launcher 40 mm AGDUS Remote Weapon Station FLW 100/200
modern/reliable components/obsolescence vehicle – hit - unit 2012 1999
Modern/Reliable Components player unit 2011 – 13 1999
AGDUS (TES) modifications AGDUS G 36 for MG 4
Compatibility PDD 1999 2013
Command/Control Logistics IT-/Mil.- Security Ergonomics Personnel / Training GeoInfo EnvironmentalSafety Organisation Infrastructure PersonellSafety Operational Viability Ca be used safely for Training and Mission Compliant to capabilities and performance parameters According to legal regulations Complete logistical support