An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bridge Design Project Me 35a Fall 2008

  2. STEP – 1 • The required file and the instruction sheet is uploaded on the course website • http://www.its.caltech.edu/~me35a • Download the file and the instruction sheet. • The instruction sheet has the information to download and install the software. • Once the software is install • Using the software open the file “me_35a_bridge_design.bdc” downloaded from the course website to load the required construction site to build the bridge

  3. Load Existing Design

  4. Load the file me_35a_bridge_design (downloaded from the course website)

  5. STEP 2 • Once uploaded the construction site can be seen • Now step 2 is to place joints and members to build your bridge.

  6. Design Tools Given Construction Site

  7. GOAL of the project • At the above given construction site – build a truss bridge at the lowest possible cost. • The necessary instructions on the project can be found in the instruction sheet on the website • Working of the software and building a bridge is briefly explained in this file.

  8. Select to draw a joint

  9. A joint is being placed by clicking here at the desired point

  10. Select to draw a member The joints that were created

  11. Truss members drawn

  12. Shows total construction cost – Objective is to minimize this

  13. Shows status of bridge – If working – Green, If under construction – yellow, If the bridge fails when load is applied - Red

  14. Apply the load on the bridge to check if it works

  15. Red – Oops..!! OUR BRIDGE FAILED..!! Red colour indicates the members that are failing – Now we need to modify the members

  16. STEP 3: Modifying the member properties • We can change the following properties of the member: • Material of the member • Diameter of the member • Cross-section of the member – Hollow or Solid cross-section

  17. Material Properties of the material used – Shows the maximum tension and compression the member can withstand

  18. Material of the Bar – Default is carbon steel. One can choose a superior material for higher strengths but it would be costly

  19. C/S of the Bar – Solid or Hollow. Hint – Use Hollow c/s for members under compression & Solid for members under tension

  20. Diameter of the Bar

  21. Increase diameter of the Bar Decrease diameter of the Bar

  22. Selected Elements – Lets now change their parameters as we have seen earlier Arrow tool to select elements

  23. Diameter of these members have been increased now

  24. STEP 4: Check by loading the bridge • We have now changed some property of the member and we would like to check if the bridge is stable now • Lets apply the loading again as done earlier

  25. Yahoo.. The members seem to be working well – they aren’t failing 

  26. Status is green – bridge is working fine – Excellent! Good job 

  27. However the cost seems to be high still

  28. Check the load test report and see what you can change for each member

  29. STEP 5: Continue the iterate on the properties of all members • Now continue to check if you can change the properties of each member and the bridge still being stable. • Do it on every member and see what is the lowest cost you can get up to

  30. Submission • Once you finish save the file as “Last_name(s).bdc” and mail to bhajay@caltech.edu • Further instructions for submission are in the instruction sheet that is available on the website

  31. Critical hints • “Load Test Report” tells you if the member is in compression or tension. If subjected to: • Tension – Use Solid Bars • Compression – Use Hollow Bars • Try to take advantage of symmetry. • Many times taking 2 bars of same properties can be cheaper than using two of much inferior but different properties