1 / 22

US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty. TBM/ITER General Arrangement Equatorial Test port Configuration Test Port Assembly Ancillary Systems Layout Port Cell Area TCWS Area. Pipe Shaft Area. Port Cell Area. Bio-shield. Cryostat. Test Port Assy.

denis
Download Presentation

US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US ITER TBM MeetingIdaho Fall, Idaho, Aug 10-12-2005M DagherP Fogarty TBM/ITER General Arrangement Equatorial Test port Configuration Test Port Assembly Ancillary Systems Layout Port Cell Area TCWS Area

  2. Pipe Shaft Area Port Cell Area Bio-shield Cryostat Test Port Assy

  3. Tokamak Building, East-West Section View Bio-Shield TCWS Area TBM Cooling system Equipment Room Pipe Shaft Area Port Cell Area Cryostat

  4. TCWS Area TBM Cooling system Equipment Room Bio-Shield Shielding Blanket Equatorial Port Cell Area Equatorial Port Assembly

  5. Test Port General Layout Equatorial Level Section Vacuum Vessel Cryostat Bio-Shield Test Blanket Module Pipe Shaft Area Frame Assembly Transporter Port Cell Area Equatorial Level 0.0 VV Port Extension VV Closure Plate

  6. Test Port Configuration VV – Cryostat Duct Cryostat VV Port Extension Bio-Shield TBM Frame Assy Transporter VV Closure Plate Pb-Li Concentric Pipe Port Cell Area

  7. Test Port Configuration Bio-Shield 3.6m 4.8m VV Port Extension Transporter TBM Frame Assy TBM VV Closure Plate

  8. TBM Frame Assembly

  9. ITER Overall view of Frame Cooling channels at the front of Frame

  10. ITER (B) Removable back-side shield Lip seal Fastening the bolts Design of “removable back-side shield” structure has been developed to accommodate possible different TBM attachments (support structures, electrical connection, cooling pipes and instrumentation).

  11. 25 mm gap all around inside frame openings 25 25 413 1710 5 25 504

  12. 504 Module Width Plan View Blanket Module Helium OUT Plenums (Top & Bottom Plates, Grid Plates & Dividers) Helium IN Plenum First Wall (Lower Channel) All Helium OUT Helium IN Plenum First Wall (Upper Channel) 68 mm I.D. Pipe Inlet Helium IN Helium IN 5 (typ wall) Back Plates Helium OUT First Wall 68mm I.D. Pipe Inlet 75 Outer Back Plate 65 95 Inner Back Plate 85 413 Module Depth 15 Grid Plate 120 PbLi OUT Helium flow channels for actively cooling The back plates 139.3 (typ 3 places) 15 Divider 7 (channel) 7 (channel) 20 (channel) 80 PbLi - IN 4 (typ wall) 28 First Wall Dimensions in millimeters

  13. Ancillary Systems • Port Cell Area • Primary Coolant Loop Pb-Li – He • Tritium Extraction System • TCWS Area • Primary FW He Coolant Loop • Secondary Coolant Systems

  14. Primary He Coolant Loop TCWS Secondary He Coolant Loop TCWS Test Port Pb-Li Primary Coolant Loop Transporter, Port Cell Area

  15. Pb-Li Primary Coolant Loop Schematic

  16. Pb-Li Primary Coolant Loop Tritium Extraction System Pb-Li Concentric Pipe Pb-Li Pump Expansion Tank Pb-Li Mixing Tank Pb-Li – He Heat Exchanger Pb-Li Dump Tank

  17. He Secondary Coolant Loops Heater Element He-H2O Heat Exchanger Pressure Control Sub-System He Circulator

More Related