1 / 15

Daily operation report Mar .15-16, 200 3

Daily operation report Mar .15-16, 200 3. G roup II. This file is now available @ Computer: Yangyu (D06), Directory: Headington. Outline. 1, 24-hour Review 2, Plasmas & Systems 3, New Information. This file is now available @ Computer: Yangyu (D06), Directory: Headington.

dennis
Download Presentation

Daily operation report Mar .15-16, 200 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Daily operation report Mar.15-16, 2003 Group II This file is now available @ Computer: Yangyu (D06), Directory: Headington

  2. Outline 1, 24-hour Review 2, Plasmas & Systems 3, New Information This file is now available @ Computer: Yangyu (D06), Directory: Headington

  3. Today’s topic: towards long pulse discharges with Fully Non-inductive Current Drive by LHW+IBW This file is now available @ Computer: Yangyu (D06), Directory: Headington

  4. Systems Vacuum: PIn ~2e-5 Pa/ Pout ~5e-4 Pa(1e-3Pa ) Toroidal Field: ItMAX ~3600-4200 A (Bt~1.7-2 Teslas) LHW: Pmax~ 500kW ( =0°) rf: IBW, Pmax~ 230kW (27 MHz) Tlimiter: South 2, North 5, South 2’ (newly replaced graphite tile) <270°C.

  5. Route of the Experiments Ip=120 kA Ne3~1e19 m-3 Scan Toroidal Field Try higher power input (LHW, IBW) Optimize displacements, GP Pursue Fully Non-conductive CD plasmas This file is now available @ Computer: Yangyu (D06), Directory: Headington

  6. Good shots It=3600A 58892, 58899, 58905, 58947, 58955, 59026, 59027, 59031, 59032, 59033, 59034 It=3800-3900A 58967, 59035,59039 It=4000A 58973 Haven’t achieved FNCD plasma @It=4200A This file is now available @ Computer: Yangyu (D06), Directory: Headington

  7. @3600A plasma with 430kW LHW+200kW IBW This file is now available @ Computer: Yangyu (D06), Directory: Headington

  8. @3900A (59035) 410kW LHW+200kW IBW This file is now available @ Computer: Yangyu (D06), Directory: Headington

  9. Effect of IBW This file is now available @ Computer: Yangyu (D06), Directory: Headington

  10. 常见加低杂波过程中粒子约束改善。 • 好的驱动效率必须在无锯齿条件下实现。

  11. ST, MHD, impurities

  12. Sequence of LHWobservation by ECE This file is now available @ Computer: Yangyu (D06), Directory: Headington

  13. Remarks • “def” calculated twice. def磁通变化量,积分器硬件积分环电压得到。 58910(含)以前,二级库去零漂处理后将原信号冲去,仍叫def. 58911(含) 以后,二级库去零漂处理后不冲原信号,取名deff. This file is now available @ Computer: Yangyu (D06), Directory: Headington

  14. Newly calibrated ECE array available The unit is now KeV instead of eV.

  15. 平台管理! 从平台掉到LHW system房间杂物 Water pump alarm. 13:30-14:30 water pump (limiter cooling) 1 hour maintenance, T too high to run (no alarm)

More Related