An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Drive Train Calculations Week 3 Day 1 Spring Quarter P. 1

  2. Drive Train Calculations • Draw pictures • Make estimates • Draw force diagrams • Do calculations in terms of algebraic symbols - include ‘safety’ factors • Substitute numbers • Refine calculations as robot takes shape Spring Quarter P. 2

  3. Drive Train Calculations • Speed Required - Example • Distance to be traveled - 20 feet • Time allotted – 1.5 minutes / 90 sec • Torque Required • Static analysis of robot on ramp • Constant velocity on ramp allows static analysis Spring Quarter P. 3

  4. Calculating the Velocity Required • Distance to be traveled - measure your path on the course - example 20 feet • Time allotted – 1.5 minutes - use 90 sec • V = Distance / time = 20 feet / 90 sec = 0.22 ft/sec • Assume the robot must go faster, example 0.25 fps or 3 inches / sec (allow for pick and deposit time) • Robot wheel is 1.75 in diameter, radius is 0.875 in • Motor speed required = velocity / (2*Pi*r) which is 0.546 rev/sec or 32.7 rpm Spring Quarter P. 4

  5. Calculating the Torque Required • Estimate weight of Robot - ~ 5 lb (use scale to weigh parts) • Handy Board and Motors • Drive Train - gears / axles / wheels / shaft encoders • Chassis - includes hot glue • Sensors - micro switches, CdS cell • Estimate internal Friction - FI ~ 0.5 lb. Try pulling or pushing robot on level ground using the spring scale. • Estimates of velocity and weight include some ‘safety’ factors Spring Quarter P. 5

  6. Static (Const. Velocity) Analysis Sum of Forces parallel to plane = 0 P - WII - FI = 0 P 3 WII 7 FI WN W Check the length and height of the ramp Spring Quarter P. 6

  7. Static (Const. Velocity) Analysis P - WII - FI = 0 WII = W sin (slope angle) slope angle = atan(3/7) = ~23 degrees WII = 5 lbs (sin(23)) = 1.97 lb P = 1.97 lb + 0.5 lb = 2.47 lb Torque = P x Radius of Wheel = 2.47 x 0.875 = 2.16 lb-in = 34.6 oz - in Stall Usable performance Torque No Load Speed Speed Spring Quarter P. 7

  8. Motor Performance Curves Different Power Settings Stall Usable performance Torque No Load Speed Speed Spring Quarter P. 8

  9. Drive Train Calculations • Is the required Torque divided between two motors? • If Torque and speed required don’t match characteristics, then gearing or motor change is required • What are critical factors? • Weight • Internal Friction • Time • Slope of ramp Spring Quarter P. 9

  10. Grading for Power Train Calculations Spring Quarter