1 / 29

From EMME to DYNAMEQ in the city of MALMÖ

From EMME to DYNAMEQ in the city of MALMÖ. www.m4traffic.se Johannes.Ostlund@m4traffic.se Anders.Bernhardsson@m4traffic.se. BACKGROUND. BACKGROUND. City of Malmö Founded the year 1250, became part of Sweden in 1658. About 300 000 inhabitants

deon
Download Presentation

From EMME to DYNAMEQ in the city of MALMÖ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. From EMME to DYNAMEQ in the city of MALMÖ

  2. www.m4traffic.se Johannes.Ostlund@m4traffic.se Anders.Bernhardsson@m4traffic.se

  3. BACKGROUND

  4. BACKGROUND • City of Malmö • Founded the year 1250, became part of Sweden in 1658. • About 300 000 inhabitants • 30 % of population represent 170 different countries. • University with 20 000 students. • Everydaymorethan 70 000 people make the 30 minutetripbetween Malmö and Copenhagen using the Öresund bridge. • Part of the transnational region of Öresund with 3.5 million inhabitants • Expectedincreaseof population with 33 % in the next 20 years

  5. EXAMPLES OF ONGOING PROJECTS IN THE MALMÖ AREA Interchange Alnarp Malmö – Copenhagen Metro Developement area NorthernHarbour InterchangeSpillepengen Developement area Western Harbour InterchangeFlansbjer Developement area - Sorgenfri Developement area Limhamn Tram Tram Developement area Kalkbrottet Developement area Hyllie Interchange Arena

  6. BACKGROUND • The city of Malmö is currently going through massive changes in its infrastructural design • New areas developed for living and working - the city prepares for a 33 % increase of population next 20 years • To meet the expected increase of travel, the city is planning different measures in the transport infrastructural design, such as tram, fastlanes for busses, better bike facilitys, motorway interchanges etc • Historically the city of Malmö have used static assignment models, such as Emme s a planning tool for different measures in the road infrastructureon a global level and microsimulation on a local level • Due to the expected increase of travel both within the city and commuting to- and from the growing region of Öresund the need of a planning tool with better possibilities to measure congestion has grown • Growing interest in what way different measures will affect route choices, queue lengths, travel times etc. both in shorter time horizons and in more strategic time horizons (20+ years)

  7. ROAD NETWORK OF THE EMME MODEL • 1 595 Zones • 14 000 Nodes • 40 000 Links • 1 900 Turnpenalties • Includes Själland and Lolland/Falster in Denmark • Used by the Swedish Transport administration • Demand from the Sampers model.

  8. EMME NETWORK IN MALMÖ – SUBAREA OF THE REGIONAL MODEL • 226 Zones • ~1 000 Turnpenalties • Demand from local implementation of the Sampers model

  9. TRANSIT NETWORK OF THE EMME MODEL National & Regional railways City public transport system Numberoftransitlines in network

  10. EMME  DYNAMEQ Network DYNAMEQ EMME ArcGIS • Detailedediting: • Transit lines • Traffic signals • Intersectiondesign • Group editing: • Link facilitytypes • Freeflowspeeds • Lanes (not intersections) • Base data: • Links • Centroids

  11. DYNAMEQ

  12. EMME  DYNAMEQ Demand Peak hours PM SAMPERS/ EMME Converter Peak hours AM 24-Hour Demand Demand Time Time

  13. DYNAMEQ DTA Peak hours AM 24-Hour Peak hours PM Generalizedcost = cost + 20 * Length

  14. DYNAMEQ Results

  15. DYNAMEQ Results

  16. DYNAMEQ 24 – hours DYNAMEQ EMME 20 000 v/d 19 000 v/d 19 000 v/d 21 000 v/d 18 000 v/d 18 000 v/d 19 000 v/d 19 000 v/d 16 000 v/d 16 000 v/d 17 000 v/d 20 000 v/d 23 000 v/d 21 000 v/d 16 000 v/d 15 000 v/d 22 000 v/d 22 000 v/d

  17. EMME vs DYNAMEQ Networktraveltimes during AM peak hour: Dynameq versus EMME OD-relations within the City of Malmö RatioDynameq/Emme

  18. EMME Networktraveltimeswith and without the useoftpfin EMME OD-relations within the City of Malmö

  19. EMME Route choice Without and WithTpf (uncalibrateddemand from Sampers) No Tpf (185 counts) Y = -426+1.16x; R2 = 0.76 Tpf (185 counts) Y = 280+0.98x; R2 = 0.82

  20. CONCLUSIONS From EMME to DYNAMEQ • Network: ArcGISpowerfultooltoeditlargenetworks • Demand: Need for moredetailed data (time + centroids) • DTA: Peak hours and 24-hours - different aims and challenges • EMME v.s. DYNAMEQ: significantdifferences in traveltimes • raisesquestionsabout the validityofdemandmodellingand cost- benefit analyses basedon EMME in congestednetworks? • EMME: The useoftpf (not default in Sweden) affects route choice and traveltimes in a significantway

  21. THANK YOU

More Related