800 likes | 936 Views
BAIRWMP Bay Area Integrated Regional Water Management Plan http://bairwmp.org/. Background/History Prop 50 2002-2006 - Prop 84 changes (2006) Bay area actions Plan Update and Projects Opportunities/ challenges. Background/History. Prop 50 -2006 BAIRWMP
E N D
BAIRWMPBay Area Integrated Regional Water Management Planhttp://bairwmp.org/ • Background/History • Prop 50 2002-2006 - Prop 84 changes (2006) • Bay area actions • Plan Update and Projects • Opportunities/ challenges
Background/History • Prop 50 -2006 BAIRWMP -Prop 50 Implementation grant -Plan development and Functional Areas • Prop 84 - Regional Acceptance Process - Sub-regions and target allocations - Project prioritization • Prop 84 Implementation Grants
Integrated RegionalWater Management Planning http://www.water.ca.gov/irwm/ • Required By State for certain funding under Prop 50-passed in 2002– $3.4 billion Total -$ 500 million for IRWM • Required Plan or “functional equivalent” to be adopted in order to receive Implementation funds
2006 BAIRWMP • Regional Group • Region Description • Objectives • Water Management Strategies • Integration • Regional Priorities • Implementation • Impacts and Benefits • Technical Analysis & Plan Performance • Data Management • Financing • Statewide Priorities • Relation to Local Planning • Stakeholder Involvement • Coordination
Prop 50 Grant • Grant received-Prop 50 Round 1- 2005/6 $12.5 million - 10% minimum match Conservation and Recycling projects • Prop 50 round 2- 2007 -Policy decision-focus on storm water/ floodplains/ watersheds -Step 1Proposal evaluated based on BAIRWMP -Not invited to step 2 • Supplemental Prop 50 -2010 • Max. $3.7 m –Not invited to step 2
Bay Area IRWMPRegional Function/ REGIONAL ENTITIES Water Supply and Water Quality *Bay Area Water Agencies Coalition- BAWAC Wastewater and Recycled Water *Bay Area Clean Water Agencies- BACWA http://www.bacwa.org/ Flood Protection and Stormwater Management Bay Area Flood Protection Agencies Association BAFPAA Watershed Management/Habitat Protection and Restoration Bay Area Watershed Network BAWN
BAWAC • Outgrowth of Water Recycling program • Created to respond to IRWM concept • Includes all major water agencies in 9 counties • Emphasis on Conservation • New technologies • Refining existing programs • Evaluating regional opportunities
BACWA • Existed since 1984 Joint Powers Agreement • All major Publicly Owned Treatment Works in all 9 counties • Emphasis on Water Recycling • Lead for $12.5 million IRWM state grant
BAFPAA • Concept developed in 2006 in response to IRWM. • Represents the 9 Bay Area counties and communities in regional and statewide issues in the area of flood protection • Approval of the Rules of Governance by the counties or agencies occurred from 2006-2009. • Collaboration on: • IRWMP, • USACE Levee Vegetation Policy
BAWN • Concept developed in 2006 • Hosted by RWQCB/ SFEP • Next Annual meeting- February 10,2012 • Workgroups established: • Policy • Outreach and Education • Monitoring and Assessment • Water and Land Use • IRWMP Coordination
Watershed Management/Habitat Protectionand Restoration (Watershed) Component • November 2006-Functional Area Component • State Coastal Conservancy • Excellent summary of watersheds and needs • Can be found on www.bairmp.org website
BAFPAA/BAWN Joint Conference • June 16,2011- Flood Protection – Watershed Restoration Joint Workshop • Over 100 people attended • Emphasis on Integration • Focus on “sub regions”
Prop 84 • Changes • Regional Acceptance Process • Sub regions/ allocations • Project prioritization • Prop 84 PSP and Grant requirements -One applicant & Scoring Process -Cost /Benefit • Bay Area Implementation Grant • 1-E funding
Prop 84 Nov. 2006- $5.4 billion total -allocated funds by “Region” -added “Climate Change” to plan -added “ Relation to local land use” to plan Total ~ $1 billion for implementing IRWMPs 25% match
Prop 84 $1 Billion for IRWM $900M Allocated to 11 Funding Areas $100M Interregional Prop 1E $300M for Storm Water Flood Management Requires consistency with IRWM Plan $ in millions
Region Acceptance Process • Required under Prop 84 • 2009 Process • Important Themes for Bay Area - Consensus Approach - Developing sub-regions - Ability to rank projects - Developing “Regional” projects
DWR decisions in September 2009 RAP Summary 46 Regions submitted Approved – 34 Regions Conditional Approval – 11 Not Approved – 1 Region Final-all approved-10 conditionally 3 address entire funding area
Regional Acceptance Process • IRWM Regions • 36 Approved Regions • 10 Conditionally Approved Regions
Sub-regions were created to • foster outreach, • coordination, • project solicitation, and • project integration
Bay Area Sub Regions
Decision-Subareas and Funding *Target Allocations (After Regional project allocation)- ½-No. of sub regions, ¼ pop. ¼ area -N bay- 25% -E bay-29 % -S bay-25% -W bay-22%
Project Prioritization • 2006 plan used “cohorts” -Evaluated but did not rank projects -Evaluation can be converted to a score and ranking
Prop 84 PSP and Grant requirements *One applicant *Scoring process * Cost/Benefit
GUIDELINES August 2010 The IRWM Grant Program is designed to encourage integrated regional strategies for management of water resources and to provide funding for both planning and implementation projects that support integrated water management • http://www.water.ca.gov/irwm/docs/Guidelines/Prop84/GL_Final_07_20_10.pdf
IRWM Program Objectives Direct Objectives Improve water supply reliability Protect & improve water quality Ensure sustainability through environmental stewardship Higher-Level Objectives Promote regional planning Financial incentive to promote integration and regional cooperation and collaboration
Bay Area Implementation grant • “Regional” Projects • One applicant-BACWA • Cost Benefit Analysis
Projects • Regional Recycling Grant request ($10 m) • Regional Water Conservation ($ 9.203 m) • Regional Green Infrastructure Capacity Building ($4.316 m) • Bay Area Wetland Ecosystem Restoration Program ($ 3.75 m) • Integrated Water Quality Improvement, Flood Management and Ecosystem Restoration in Bay Area Disadvantaged Communities ( $2.2 m) • Admin- ($ .643 m) Total-~ $30.094 m
Recycling-North Bay • NBWRA Projects • Novato North- NMWD- $ 500k • Novato South-Hamilton-LGVSD - $ 500k • Napa State Hospital-Napa San.- $ 500k • Sonoma Valley- SCVSD/ SCWA- $ 500k • Peacock Gap- MMWD- $ 500k Total= $2.5 m
Regional Recycling • Match-$, 55,815 m (85 %) • Acre feet/ year- 3,210 AFY • Costs- $53 m (50 years)- 2009 dollars • Benefits- ~ $ 108 m • Avoided alternative water supply project costs • Avoided potable water supply costs • ~ $1m- WQ avoided fertilizer costs
Conservation- North Bay • City of Napa- $330 k • SCWA $765 k • Solano $ 692 k • MMWD $ 863 k 31.6 % of $ 8.39 m • General- 31.6 % of $ 562 k = $178 k • + Napa Rainwater = $250 k Total $ 3.078 m
Regional Water Conservation Match $ 6,438,872 (42 %) Total- ~ $15.4 m Acre feet- 25,546 over 10 years Cost / acre –ft- ~ $605 2009 costs- $12.7 m Benefit- 10 year present value- ~ $ 25 m
Regional Green InfrastructureNorth Bay • No North bay projects • Napa Rainwater harvesting shifted to conservation for administration purposes.
Bay Area Wetlands –North bay • Sears Point- $1.25 m
Wetlands • State Coastal Conservancy lead-3 projects • $3.725 m request, $16.53 m match + other state funds ($8.9 m)-57% match • 2009 annualized costs- ~$ 25 m • 2009 annualized benefits ~ $ 130 m
Integrated… Components 1. Watershed Partnership Technical Assistance ( $150 k) 2. Stream Restoration with Schools and Community in Disadvantaged Communities of the North Bay (STRAW) ($200 k) 3. Floodplain Mapping for the Bay Area with Disadvantaged Communities Focus ( $712 k) 4. Storm Water Improvements and Flood Reduction Strategies Pilot Project in Bay Point ($160 k) 5. Disadvantaged Communities Richmond Shoreline and City of San Pablo Flood Project ( $85 k) 6. Pescadero Creek Watershed Disadvantaged Communities Integrated Flood Reduction and Habitat Enhancement Project ($100 k) 7. Pescadero Creek Steelhead Smolt Outmigrant Trapping ( $119 k) 8. Stream Channel Shapes and Floodplain Restoration Guidance and Watershed Restoration in San Francisquito Creek, East Palo Alto, a Disadvantaged Community ($230 k) 9. Steelhead and Coho: Bay Area Indicator for Restoration Success SF Estuary Steelhead Monitoring Program ($379 k)
Integrated Water Quality Improvement, Flood Management and Ecosystem Restoration in Bay Area Disadvantaged Communities • North Bay -STRAW ( PRBO)- $200k General mapping and watershed assistance share of ($862 k) 25% - $ 216k North bay share of $379 for Steelhead Napa and Sonoma ~$ 250 k
Integrated Water Quality Improvement, Flood Management and Ecosystem Restoration in Bay Area Disadvantaged Communities • Total request- $2.134 m • Match- -$705 k - 33 % • Consolidation of prior proposals and emphasis on DACs 2009 annualized costs-$1.6 m Benefits- $ 2.1 m ( stormwater treatment- STRAW)
1-E-Stormwater Flood Management (SWFM) grants • Projects -Manage stormwater runoff to reduce flooding and are ready, or nearly ready, to proceed to implementation - Consistent with applicable Regional Water Quality Control Board Basin Plans, not be part of the State Plan of Flood Control and -Yield multiple benefits which may include groundwater recharge, water quality improvements, ecosystem restoration benefits, and reduction of instream erosion and sedimentation. -In IRWM Plan • $ 212 m statewide competition 50% match, Max $ 30 m
1-E results • Sep. 21 DWR Draft Funding recommendations http://www.water.ca.gov/irwm/integregio_stormwaterflood.cfm -41 Applicants for $ 265 m • 18 recommended for $163 million • 4/5 approved for Bay Area for ~ $67 m SFPUC- $24m, SCVWD-$25 m, San Francisquito Creek JPA-$ 8m Not funded- Redwood City Pump station-$ 8 m North bay • Marin County FCWCD/ MMWD -Phoenix Lake- $7.66m
Plan Update and Projects • Elements and schedule • Emphasis on integration • Project Template • Future County Meetings • Maps?
BAIRWMP Plan Proposal • Submitted September 27, 2010 • MMWD is applicant • Grant request-$842,556 • Match- $569,761 ( ~ 40 %) • Cash- $210,494 • In kind- $359,267 • Includes- SVCSD -Groundwater plan Salt and Nutrient Management Planning $205k request & 50% match ( 25 % cash, 25% in kind)