1 / 4

Gate Valve Assembly Lab

Gate Valve Assembly Lab. Final Report, Data Analysis, Presentation. Final Report: Main Components.

derron
Download Presentation

Gate Valve Assembly Lab

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gate Valve Assembly Lab Final Report, Data Analysis, Presentation

  2. Final Report: Main Components The following parts must be present to make your technical report complete. See “Report Writing Links & Examples” on Mrs. Fitzsimmons’ webpage (http://www.ccctc.k12.oh.us/Reports.aspx) for help • Summary/Executive Summary/Abstract • Introduction • Discussion (should include data analysis & discussion questions) • Conclusion • Appendix (put any graphs/charts that don’t fit in discussion here) Use your “Peer Review Document” and “Technical Report Rubric” as guides

  3. Data Analysis (the following information should be included in your technical report) • Which role in your assembly line created a “bottleneck?” Which role is most underutilized? • Construct a pie chart of estimated costs (space, personnel, internal/external defects, wrong orders, etc.). Where does the greatest opportunity lie for improving the process. What is the cost of quality? • What is the rate of production necessary to fulfill customer demand? • Neatly diagram the new system. You may make by hand or use technology. Label stations with sequence numbers. Provide average cycle times. Indicate bottlenecks. Indicate personnel. Indicate process flow with lines and/or arrows.

  4. Discussion Questions • Using you diagram, your results and analyses, what problems in your assembly line system did you need to address in order to meet customer expectations? Include the customer expectations in your answer. • Based on your experience, what were the causes of poor performance for your assembly line? • What issues or problems were not addressed after changes were made to your assembly line? • How do you believe the system could be automated? • Where is the joining of materials used within this assembly line? • Describe any issues you encountered with the lab and make suggestions as necessary to help improve it, keeping in mind the goal of introducing a student to assembly line production without automation. • What are the changes your team will recommend to “optimize” the system? • What are the duties, responsibilities, and educational requirements for a career as a manufacturing supervisor?

More Related