1 / 28

Business Process

Business Process. A logically related sets of tasks or activities geared toward some business outcome. 1. Primary (value-added) 2. Support 3. Developmental. Suppliers Purchasing Engineering Operations Finance Marketing Customers. Developing new products (Chapter 5).

Download Presentation

Business Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Business Process A logically related sets of tasks or activities geared toward some business outcome. 1. Primary (value-added) 2. Support 3. Developmental

  2. Suppliers Purchasing Engineering Operations Finance Marketing Customers Developing new products (Chapter 5) Evaluating suppliers (Chapter 9) Developing sales & operations plans (Chapter 11) Versus the “functional” Perspective

  3. Relationship Map

  4. A Detailed Process Map

  5. Start or finishing point Step or activity in the process Decision point (typically requires a “yes” or “no”) Input or output (typically data or materials Document created Delay Inspection Move activity Mapping Symbols Typical, but others may be used as appropriate

  6. Improving Business Processes: Guidelines • Attack each delay • What causes it? • How long is it? • How could we reduce its impact? • Examine each decision point • Is this a real decision or just a checking activity? • If the latter, can we automate or eliminate it?

  7. More Guidelines • Look for loops • Why is this loop here? • Would we need to loop if we didn’t have any failures in quality, planning, etc? • Process steps • What is the value of this activity, relative to its cost? • Is this a necessary activity (support or developmental?), or something else?

  8. Process Measures • Productivity • Efficiency • Cycle Time • Benchmarking

  9. Outputs Inputs Productivity Measures Productivity = Partial, Multifactor, and Total measures of productivity

  10. Single factor productivity ratio: Multifactor: Total: Batteries Produced Direct Labor Hours Batteries Produced Machine + Direct Labor Hours Total Nightly Sales ($) Total Nightly Costs Examples

  11. Efficiency A comparison of a company’s actualperformance to some standard • Usually expressed as a percentage • Standard is an estimate of what should be produced based on studies or historical results • Efficiency = 100%(actual/standard)

  12. Cycle Time The total time required to complete a process from start to finish. The percent of cycle time spent on value-added activities is a measure of process effectiveness.

  13. Cycle Time Drivers Causes that increase cycle time are: • Waiting times • Unneeded steps • Rework • Unnecessary controls or testing • Outmoded technology • Lack of information or training

  14. Benchmarking A comparison of a company’s performance to the performance of: • Other firms in its industry(strategic) • Firms identified as “world-class” (process)

  15. Classic Mfg. Process Types(in order of decreasing volume) • Continuous Flow • Production Line (Flow Line) • Batch (High Volume) • Batch (Low Volume) • Job Shop • Project

  16. Continuous Flow • Large production volumes • High level of automation • Basic material passed along, converted as it moves • Usually very high fixed costs, inflexible Oil refinery, fiber formation, public utilities

  17. Production Lineaka Flow Line and Repetitive Manufacturing High-volume production of standard products or “design window” • Processes arranged by product flow • Often “paced” • Highly efficient, but not too flexible

  18. Batch I • Somewhere in between job shop and line processes • Moderate volumes, multiple products • Production occurs in “batches” • Garment manufacturing, carton makers, etc.

  19. Batch II Layout is a cross between that found in a line and that found in a job shop: Group Technology

  20. Job Shop • Low volume, one-of-a-kind products • Job shops sell their capability • Highly flexible equipment, skilled workers • Equipment arranged by function

  21. Project • Used when a product is: • one-of-a-kind • too large to be moved • Resources moved to where needed • Equipment, people, etc. are highly flexible • Finite duration, often with deadline Building projects, equipment installation

  22. Mixing Together the Process Types ... Spindles ASSEMBLY LINEfor putting together final product Arms and Legs BATCH for fabricating parts ... Seats

  23. Comparing Process Types...

  24. Product – Process Matrix Very Poor Fit Very Poor Fit

  25. Life-Cycle Planning Framework • Centralized • inventory • Speed • Availability • Achieve break- • even volumes • as soon as • possible • Less need • for flexibility • High • product • availability • Flexibility • to handle • variation More selective, targeted efforts Value-added service

  26. What is “Customization”? “Customization occurs when a customer’s unique requirements directly affect the timing and nature of operations and supply chain activities”

  27. Customization Point Model Definitions: ETO – engineer to order MTO – make to order ATO – assemble-to-order MTS – make to stock

  28. Layout Decision Models • Product-based layout • Usually best for a line operation • Cycle time a primary measure • Functional (Process-based) layout • Usually best for a job shop • Distance between steps a measure • Cellular layout • Usually best for batch processes

More Related