540 likes | 678 Views
Humidifiers for Every Application. Pressure Steam Humidifiers Designed to deliver Reliable humidity from facility steam boilers . SAM-e. SAM-e Components. Mounting Frame. Steam Tubes. Header. Inlet Adapter. Condensate Drain. SAM-e Header. Fits ducts 18” – 144” wide
E N D
Pressure Steam Humidifiers Designed to deliver Reliable humidity from facility steam boilers
SAM-e Components Mounting Frame Steam Tubes Header Inlet Adapter Condensate Drain
SAM-e Header • Fits ducts 18” – 144” wide • 3”, 6”, 9” or 12” spacing • Atmospheric or pressure steam 9.0” 8.7” Spacing Width
SAM-e Header 801 – 1200 lbs/hr • Atmospheric steam • 3”, 6”, 9” or 12” spacing • Fits ducts 42” – 144” 9.0” 8.7” Spacing Width
SAM-e Steam Tubes • Lengths from 6” to 132” • 4 Types: • Type A: 15 lbs/hr (20 Tubelets) • Type B: 36 lbs/hr (48 Tubelets) • Type B+: 55 lbs/hr (74 Tubelets) • Type C: 75 lbs/hr (102 Tubelets) Length
How does the SAM-e Work? Steam Tube Cross Section Airflow Tube wall Hot Steam Nozzles Condensate
Atmospheric Installation Atmospheric Steam Trap and Funnel
Pressurized Installation With External Steam Separator Strainer Valve and Actuator Steam Main Separator F&T Steam Trap F&T Steam Trap Pressurized Condensate Return Main Return to Non-Pressurized Condensate Return Main or Drain
Pressurized Installation Without External Steam Separator
Pressurized Installation SAM-e Internal Baffle Internal Baffle Plate
SAM-e Mounting Options In-Duct Mounting • Header sits on duct floor • Mounting frame optional
SAM-e Mounting Options Outside Duct Mounting • Header sits under duct floor • Mounting frame optional • Cover plates required
SAM-e Mounting Options Vertical Duct Mounting • Mounting frame required • 10 – 30° angle Condensate drain at lowest point
SAM-e Accessories Mounting Frame Stand Kit Cover Plates
Why Insulate? SAM-e Insulated Option • Wasted energy - Lost heat is lost money • Wasted Water (Condensate) • Air stream heat gain • Low humidifier output • Low system efficiency
Benefits of Insulation SAM-e Insulated Option • Thermal Resistance, R = 0.66 ft-ºF-hr/Btu • 70% condensate reduction • 120°F max surface temperature • Reduce heat gain • Improved efficiency
Insulated SAM-e Header Insulation Tube Insulation
Principle of Operation Insulated Steam Tube Cross Section Cool Airflow Stainless steel shielding ¼” Air-gap Foam strips Hot Steam
Mini SAM-e • For ducts 12” x 8” to 24” x 24” • Horizontal flow only • Capacities up to 210 lbs/hr
Mini SAM-e Header • 12”, 18” and 24” widths • 3” or 6” spacing 6.5” Width 3.25”
Mini SAM-e Steam Tubes • Lengths from 5” to 21” • 3 Types: • Type MA: 10 lbs/hr (14 Tubelets) • Type MB: 20 lbs/hr (28 Tubelets) • Type MC: 30 lbs/hr (40 Tubelets) Length
Insulated Mini SAM-e Header Insulation Tube Insulation
Distributor Discharging Water? • Verify steam trap operation • Ensure steam trap orifice is not clogged • Ensure proper amount of steam traps • Ensure pipe and traps are sized correctly
Leaking Around Tube Seals? • Verify seal is fully inserted • Check for physical damage • Verify that stopper plate is in place • Verify chemicals added to boiler
Steam Condensing on Duct Wall? • Verify duct psychometrics • Check for unusual flow patterns • Check operation and installation of high- limit humidistat • Check valve and humidifier output
SE Models Features SETC Total Controller LCD display 4 status relays Dual-modulation capability Variety of control signals Staged modulation Outdoor model available Links2 ,Links XPS, OnLine compatible SEP Proportional controller LED status lights Fault relay only Single modulation only 4-20 mA and 0-10VDC only
SE Features • 50 lbs/hr to 1050 lbs/hr output • Wye Strainer • Steam Valve and Actuator • Built-in F&T Trap(s) • Built-in P-Trap • Built-in Drain Water Cooler • Insulation and Cabinetry • Fill System & Blow Down • 316 SS heat Exchanger • Easy Access Cleaning ports
SE Clearances SE 100/175 SE 250/375 SE 525/750 SE /1050
SE Installation Accessories Floor Stands SE-050 Ceiling Kit
Principle of Operation Valve/Actuator Assembly Dual Fill Valve Tank Float Chamber Fill Box Vacuum Break Steam from Boiler Steam Trap Drain Outlet Heat Exchanger Drain Pump Condensate to Boiler or Drain Auxilary Tank Drain
SETC Typical Installation Plumbing Connections Boiler Steam Connections
SETC Typical Installation Plumbing Connections Boiler Steam Connections Boiler Steam 5-15 psi CV Valve and Actuator Pressure Gauge (optional) Water Supply 30-80 psig Wye Strainer F&T Trap (By others) Drain Outlet Air Gap Condensate Drain Line Auxiliary Drain
Cleaning Top Maintenance Door (SE525-1050 Only) Top Cover Gaskets Front Cover Front Maintenance Door
Troubleshooting Display Message: Drain Ck Fault LED:Red System Detected: The drain pump is activated but water level has not decreased.