S Well: High Island 309, Well A-16 Coiled Tubing” 1-1/4” Tubing: 2-7/8”, 6.5 # / ft

S Well: High Island 309, Well A-16 Coiled Tubing” 1-1/4” Tubing: 2-7/8”, 6.5 # / ft Casing: 7-5/8”, 29.7 # / ft GLM Type: SFO-1 GLM Depth: 1950’ TVD, 3672’ MD Inclination: 82 degrees. S Bottom Hole Assembly Bi-directional jars Knuckle Joint OK-1 type kickover tool w/ catcher.

dessa
Download Presentation

S Well: High Island 309, Well A-16 Coiled Tubing” 1-1/4” Tubing: 2-7/8”, 6.5 # / ft

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. S Well: High Island 309, Well A-16 Coiled Tubing” 1-1/4” Tubing: 2-7/8”, 6.5 # / ft Casing: 7-5/8”, 29.7 # / ft GLM Type: SFO-1 GLM Depth: 1950’ TVD, 3672’ MD Inclination: 82 degrees

  2. SBottom Hole Assembly Bi-directional jars Knuckle Joint OK-1 type kickover tool w/ catcher

  3. S Procedure • Run memory gauge bomb on end of coil tubing with collar locator. Correlate surface CT counter depth to depth of mandrel as determined from memory gauge. • RU BHA w/ OK-1 kickover tool. Run slightly past desired mandrel depth. Pick up tools slowly. Watch for increased weight when KOT locates in mandrel. • Set tools down till weight drops off on indicator. • If pulling a valve, jar up a few times if necessary. • If setting a valve, jar down a few times if necessary.

  4. S Rigging down to remove pulled GLV.

  5. S Rigging down to remove pulled GLV.

  6. S Rigging down to remove pulled GLV.

  7. S Pulled GLV on deck attached to KOT.

  8. S Removing pulling tool from OK-1 KOT.

  9. S Bi-directional jars and knuckle joint run above KOT.

  10. S Rigging up valve on Running Tool & KOT to RIH

  11. S RU to run GLV in well on KOT

  12. S Stabbing tool string in lubricator.

  13. S Attaching tool string to coil tubing.

  14. S Attaching tool string to coil tubing.

  15. S Nipple up to lubricator, RIH, Set GLV

  16. S Removing KOT after setting GLV

  17. S Laying down KOT & jars after setting GLV

  18. S KOT , K.J., & Bi-directional jars on deck after running GLV.

  19. S KOT w/ running tool on K.J. and bi-directional jars

  20. S GLV running tool string