An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Low Cost Safety Improvements Pooled Fund Study (PFS)presented byKim Eccles, P.E.Senior Engineer, VHB

  2. Background • AASHTO’s Strategic Highway Safety Plan • Leading to development of NCHRP Report 500 Guidebooks • 22 are planned, 17 are published and available • Guidebooks contain safety “strategies” • 80% of strategies are ‘tried’ or ‘experimental’ • After lead states developed their safety plans, they were encouraged to implement the guidebook strategies Low Cost Safety Improvements PFS

  3. Purpose of Study • Safety practitioners continuously voice the need for safety effectiveness data • Accident Modification Factors (AMFs) • Study will perform rigorous before-after evaluations of strategies found in NCHRP Report 500 Guidebooks Low Cost Safety Improvements PFS

  4. Project Status • Current committed participants (26): • AZ, CA, CT, FL, GA, IA, IL, IN, KS, KY, MA, MD, MN, MS, MT, NC, ND, NY, OK, PA, SC, SD, TN, TX, UT, VA • Total state committed funds: $2,880,000 • FHWA funding is $1.5 Million • Total anticipated project funds: $4,380,000 • To date, there are 3 contracts initiated for this project • NCHRP 17-35, Low Cost Safety Improvements project Low Cost Safety Improvements PFS

  5. Completed Activities • Technical Advisory Committee (TAC) met in March 2005 to develop a prioritized list of strategies to be evaluated • 60 Strategies from the following guidebooks: • Aggressive Drivers • Unsignalized Intersections • Lane Departure (Run Off Road, Hazardous Located Trees, Head On) • From these strategies, installation data were collected from all states for the 30 highest priority strategies (based on TAC ranking) Low Cost Safety Improvements PFS

  6. Completed Activities • Scoping Study resulted in four strategies that had enough installation data to perform evaluations • Center two way left turn lanes on two lane roadways (2 to 3 lane conversions) • Pavement markings with supplementary message “STOP AHEAD” • Flashing beacons at stop controlled intersections • Higher retro-reflectivity sheeting for stop signs Low Cost Safety Improvements PFS

  7. Installation Databases • It is crucial to collect installation data and before conditions to evaluate safety effectiveness Low Cost Safety Improvements PFS

  8. Installation Databases • Records of dates and locations of safety improvements difficult to locate • Records may not be kept or may be in paper file • Local offices may maintain records • Information may be incomplete • Developed a simple database for maintaining implementation records • Can be used directly or as a model Low Cost Safety Improvements PFS

  9. Installation Databases • Information entered separately based on type of strategy • Intersection • Segment • Spot • Microsoft Excel or Access • Access form to facilitate data entry • Logmile, GIS, or Link-Node System Low Cost Safety Improvements PFS

  10. Information in Database • Location information • Jurisdiction, county, streets, milepost (or similar) • Roadway or intersection type • Surrounding area (e.g. rural) • Prior condition • Volume and year • General condition information Low Cost Safety Improvements PFS

  11. Information in Database • Treatment information • Treatment (drop down list or write-in) • Description • Cost • Construction dates • Other changes • Other information • User can add or modify database as needed Low Cost Safety Improvements PFS

  12. Low Cost Safety Improvements PFS

  13. Low Cost Safety Improvements PFS

  14. Low Cost Safety Improvements PFS

  15. Other Information on CD • Read-Me File • Explains use of CD • Provides explanation of all variables • PDF copies of 500 Series Volumes 1-6 • 2-page information sheet on study Low Cost Safety Improvements PFS

  16. Copies of Information • VHB mailed two CDs to each participating state • Will provide additional copies upon request • Available on project website Low Cost Safety Improvements PFS

  17. Project Website www.tfhrc.gov/safety/evaluations • Update on current activities • Installation databases available for download • Links to other ongoing studies • Will eventually house comprehensive list of Accident Modification Factors Low Cost Safety Improvements PFS

  18. Current Activities • Final data collection and evaluations are ongoing for the four strategies in Phase I • What impact does the treatment have • Crash type considered • Various safety effects of treatments • Draft results will be available at the beginning of 2007 Low Cost Safety Improvements PFS

  19. Current Activities • Kickoff of Phase II of evaluation at the second TAC meeting (June 1-2, 2006) • Older Drivers, Trucks, Pedestrians, Horizontal Curves, and Utility Poles • States ranked strategies prior to meeting, resulting in “Top 16” • Few states brought installation data on top 5-10 strategies • Currently in search of data Low Cost Safety Improvements PFS

  20. Current Activities • Strategies with high potential for evaluation during Phase II (based on the second TAC meeting, June 1-2, 2006) • Various lane width versus shoulder width configurations (for a given roadway width) • Advance warning signs at intersections, particularly effect on older drivers • Modifying sight distance on horizontal curves (most likely through reconstruction) Low Cost Safety Improvements PFS

  21. Future Activities • Contractor will complete the evaluations of the first four strategies (Phase I) • Draft results January 2007 • New contract just signed to continue with the next group of evaluations (Phase II) • Draft results early 2008 Low Cost Safety Improvements PFS

  22. Project Roadmap Low Cost Safety Improvements PFS

  23. Project Contacts Kerry Perrillo Childress Kerry.Childress@fhwa.dot.gov Kim Eccles (VHB) Keccles@VHB.com 919-834-3972 Project Website: www.tfhrc.gov/safety/evaluations Low Cost Safety Improvements PFS