70 likes | 263 Views
Compton Electrons. Jeff Martin University of Winnipeg. Compton Recoil Electron Kinematics. Struck electron loses energy equivalent to photon energy increase. Very little angular deflection. At 850 MeV, max energy loss is E = 25 MeV [Bates].
E N D
Compton Electrons Jeff Martin University of Winnipeg
Compton Recoil Electron Kinematics • Struck electron loses energy equivalent to photon energy increase. Very little angular deflection. • At 850 MeV, max energy loss is E = 25 MeV [Bates]. • Struck electron is momentum analyzed using downstream dipole magnet. e.g. Mainz Compton
Compton Survey(focusing on electron detection) others: NIKHEF, VEPP-3, VEPP-4, SPEAR, CESR, DORIS, PETRA, HERA trans., LEP
Typical Requirements forElectron Detector (Mainz & Hall A) • ~ mm spatial resolution in dispersive direction • high efficiency (no gaps) • high rate capability (up to 100 kHz) • rad hard Notes: • Both Mainz & Hall A use CW laser operation (we don’t intend to) • background rates highly dependent on energy and beam tune [Nanda, Hall A]
Technologies Under Consideration for Hall C Compton • Silicon • advantages: proven technology (Hall A), acceptance easy to understand, rad hard. • disadvantages: slow? potentially high electronics costs. • SciFi • advantages: fast, cheap, use Si-PM readout • disadvantages: rad hardness? more difficult acceptance? • alternate: quartz fiber; same readout, very rad hard. • GEM • advantages: cheap, rad hard, fairly fast. • disadvantages: electronics costs hard to estimate, potentially complicated R&D project on its own.
Si cost estimate (C. Davis, et al 2005 NSERC submission) Note: RTI category 1 limit is $150 kCAD.
Roadmap to First Light • Decide technology ASAP • Base decision on: • rates (signal and background) • granularity (guess similar to Hall A and Mainz?) • fiducializability? • Current favorite: …? Input from collaboration/experts? • Begin detailed budgeting for upcoming grant cycles • NSERC: deadline end of Oct. • DOE: deadline Nov. • Need ideas on how to split tasks (MSU vs. UWpg/Canadians) • Detailed simulations – decide position wrt chicane dipoles. • Prototyping • Receive funding • Build it