DECISION TREE Project Risk Management: A combined Analytic Hierarchy Process and Decision Tree Approach Dr.Prasanta Kumar Dey
CONTENT • What is the decision tree? • The example of decision tree • The advantage of decision tree • The application of decision tree
WHAT IS THE DECISION TREE? • Decision tree is a decision support tool that uses a tree-like graph or model of decisions and their possible consequences, including chance event outcomes, resource costs, and utility. • Decision tree is commonly used in operations research, specifically in decision analysis, to help identify a strategy most likely to reach a goal. • Another use of decision trees is as a descriptive means for calculating conditional probabilities.
THE ADVANTAGE OF DECISION TREE • Are simple to understand and interpret. • Have value even with little hard data. • Use a white box model. • Can be combined with other decision techniques.
Project Risk Management: A combined Analytic Hierarchy Process and Decision Tree Approach Dr.Prasanta Kumar Dey
RISK MANAGEMENT PROCESS • Risk identification • Risk analysis • Risk response
METHODOLOGY • Identifying the work packages for risk analysis. • Identifying the factors that affect the time, cost, and quality achievement of a specific work package. • Analysis the effect and determining severity of failure • Driving various alternatives responses for mitigating the effect of risk factors. • Estimating cost for each alternative • Determining the probability and severity of failure of a specific work package • Forming a decision tree. • Deriving expected monetary value or the cost of risk response in this case. • Selecting the best option statistical analysis.
IDENTIFICATION OF WORK PACKAGES • Riving crossing • Pipeline laying • Stations construction • Telecommunication and SCADA system
IDENTIFICATION OF RISK FACTORS • Technical Risk • scope change • technology selections • implementation methodology selection • Equipment risk • materials risk • Engineering and design change • Acts of God • normal natural calamities • abnormal natural calamities
Financial, Economical and Political Risk • inflation risk • fund risk • changes of local law • changes in government policy • improper estimation • Organization Risk • capability risk of owner’s project group • contractors failure • vendor’s failure • consultant’s failure
Statutory Clearance Risk • environmental clearance • land acquisition • clearance from chief controller of explosives • other clearance from government authorities
DECISION ALTERNATIVES • do nothing • carrying out detailed survey • using superior technology • engaging an expert project team • taking all responses
DECISION TREE FOR TELECOMMUNICATION AND CATHODIC PROTECTION WORK PACKAGE
RISK RESPONSES • To avoid • To reduce • To transfer • To absorb
CONCLUSION • Risk management using a combined AHP and DTA provides an effective means for managing a complex project efficiently. • Risk management makes an effect to quantify risk by modeling its probability and severity in line with the perceptions of experienced project executives subjectivity.