An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PUBLIC PARTICIPATION (PP)FORthe 2013 FEDERAL STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (FSTIP) Office of Federal Transportation Management Program Lima Huy (916) 651-7411 Email: lima.huy@dot.ca.gov

  2. Topics • Adoption - PP Requirements for the 2013 FSTIP Update • Amendments - PP Requirements for the 2013 FSTIP Revision • Regulations - In connection to PP

  3. 2013 FSTIP Update Process • 2013 FSTIP Process mirrors the 2011 FSTIP • Delayed timeline to allow time to include the adopted STIP and SHOPP • Coordinated effort

  4. Adoption - PP Requirements for the 2013 FSTIP Update

  5. Adoption - PP Requirements for the 2013 FSTIP Update (con’t)

  6. FTIPs Listed in the FSTIP by Reference

  7. Adoption - PP Requirements for the 2013 FSTIP Update (con’t)

  8. Consequence of Not Meeting Deadline • If any MPO does not meet the deadline for 2013 FTIP submittal, its 2013 FTIP will not be included in the 2013 FSTIP until the 2013 FSTIP has been approved by the FHWA/FTA. • Caltrans post that MPO’s 2013 FTIP on the FSTIP website for 14 days to allow for public review. • FHWA/FTA approval of the 2013 FSTIP may take up to 30 days. • Cannot obligate projects until FTIP receives federal approval.

  9. Other Notes • During the development of the 2013 FSTIP, any amendments or modification to the board adopted 2013 FTIPS will be included in the Draft 2013 FSTIP if they are submitted to the Department seven days prior (by October 1, 2012) to the start of the public review of the Draft 2013 FSTIP. • Any amendments and modifications that do not meet the deadline will be processed after the federal approval of the 2013 FSTIP. • Note: On December 17, 2013, the 2011 FSTIP is no longer valid.

  10. 2013 FSTIP Amendment Process • FSTIP PPP relies on a public review period that is concurrent with each MPO’s public comment period • Process has been effective in streamlining the public participation process and expediting approval of amendments • Same PP amendment process for the 2013 FSTIP

  11. Amendments - PP Requirements for the 2013 FSTIP Revision

  12. Amendments - PP Requirements for the 2013 FSTIP Revision (con’t)

  13. Consequence of Not Posting Amendment at the Start of Public Review Date • Failure to post an amendment for concurrent public review at the start of the public review period will cause a delay in approval. • The state will have to post the MPO’s amendment on the 2013 FSTIP website for a period of 14-days upon receipt of a completed/board approved amendment to allow time for public review.

  14. Regulations in Connection to PP Metropolitan Planning Regulations • Public involvement requirements in metropolitan planning 23 CFR 450.316 • Public involvement and consultation requirements in the RTP 23 CFR 450.322 • Public involvement and consultation in connection with the FTIP 23 CFR 450.324 Statewide Planning Regulations • Public involvement requirements in statewide planning 23 CFR 450.210 • Public involvement and consultation in connection with the Statewide Transportation Plan 23 CFR 450.214 • Public involvement and consultation in connection with the TIP 23 CFR 405.216 • http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Title23/23cfr450_main_02.tpl