M Tech Project – First Stage Improving Branch-And-Price Algorithms For Solving 1D Cutting Stock Problem. Soumitra Pal [05305015]. Agenda. Cutting stock problem & formulation Generic Branch-and-price algorithm Implementation by Vance [1994], etc Work in next stage Conclusion.

dewey
Download Presentation

Soumitra Pal [05305015]

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. M Tech Project – First Stage Improving Branch-And-Price Algorithms For Solving 1D Cutting Stock Problem Soumitra Pal [05305015]

  2. Agenda • Cutting stock problem & formulation • Generic Branch-and-price algorithm • Implementation by Vance [1994], etc • Work in next stage • Conclusion

  3. Cutting stock problem • Bigger rolls (raw) available • Orders of smaller rolls are to be cut (items) • Minimize no of raws used

  4. IP formulation • λj denotes the no of rolls cut in pattern j • aij denote no of times item i is cut from pattern j • bi is order for item i

  5. Solution using branch-and-price • Branch-and-bound technique of IP • The bound is calculated using LP relaxation solved by column generation

  6. Generic branch-and-price algorithm Generate Initial heuristic. Set it as incumbent. Make root node of BB tree and enter into Q Y Unexamined node exists in Q? N Undiscovered? Y N Calculate LB (column generation)Set the node as discovered Set the node as examined LB >= incumbent? LB = some feasible sol X and X< incumbent? Y N N Y Fathom(do nothing) Update incumbent to X Branch (i.e. make two nodes and make them undiscovered and unexamined and enter in Q) Stop; incumbentis the solution

  7. Column Generation in brief • Take few initial feasible columns • Solve the restricted master problem • Use the dual solution of the master problem as the profit for the knapsack problem to get new better column • Continue as far as better columns can be found

  8. BAP implementation variations • Initial heuristic solution • Branching rule • Node selection rule • Bounds

  9. Branching rules • Excludes fractional solution • Guarantees feasible solution after a finite number of steps • Must encode branching info in subproblem • Creates trees of ~ equal size • Keeps master & subproblem tractable

  10. Conventional branching • Excludes fractional solution • Finite no of steps since finite no of variables • Encoding of branch info is explained next λp = α λp ≥ ceil(α) λp ≤ floor(α)

  11. Subproblem modification • On the right branch, it is equivalent to reducing the demand vector & solve the residual • No need to modify the subproblem • On the left branch, the column should not be regenerated • This is done by keeping forbidden list in subproblem

  12. Problem in conventional branching • Solution space is not equally divided on both the branches • Here, solution space is equivalent to all possible columns • On the right branch, no of possible new columns is reduced • Left branch reduces only one column • Subproblem may become difficult

  13. Branching for BCS (demand=1) • Branching rule by Vance [1994]

  14. Branching in BCS (2) • Left branch should include both items l and m together • This can be solved by replacing the two items by one item of combined width • On the right branch, at most one of them should get included • This is solved by including edge constraints in the subproblem • The subspaces are of ~ equal size

  15. Solving the subproblem • When no edge constraint, solve using Horowitz-Sahni algorithm • When no overlapping edge constraints, solve using modified HS using Jhonson-Padberg bounds • When overlapping edge constraints, use general IP solver

  16. Horowitz-Sahni algorithm • Backtracking with bounds • Items ordered in decreasing profit density (profit/weight) • In forward move, try inserting one item • Bound • If U>current best, move forward • Otherwise backtrack (remove last inserted item) & repeat • Update current best when last item is considered • Stop when no more backtracking is possible

  17. Jhonson-Padberg algorithm • Solves Knapsack Problem with SOS • SOS is a set of variables, at most one can be set to 1

  18. Jhonson-Padberg algorithm (2) • Order SOSs according to max p/w • If w1≥W, set corresponding x1=W/w1 and all other xi=0 • Otherwise, RECORD xi for the item with minimum weight • Remove from S1, all items having profit less than wi; update remaining items in S1, pj-=pi, wj-=wi and W-=wi • Repeat • If multiple items in same SOSs is RECORDED, set variables as shown in the example

  19. JP algorithm Example

  20. Modified HS • Use SOS ordering • In forward move at most one from each SOS can be inserted • Bound is calculated using JP • In backtrack, other item in the same SOS is considered next

  21. Branching for general CSP • Branch on a set of variables • Need to explore more

  22. Bounding • Bounding can be used to avoid tailing-off effect • When the following condition is satisfied, column generation can be stopped

  23. Initial heuristic solution • First Fit Decreasing (FFD) • Items in decreasing size is fit in existing roll • If can not be fit, use a new roll

  24. Work in next stage • Complete literature survey • Vance [1998] • Vanderbeck [1999] • Degraeve and Peeters [2003] • Carvalho [1999] • Comparative study of them • Different set of experimental instances • Time quoted are on different machines • Need to gather absolute numbers such as no of nodes, no of sub-problems etc

  25. Knapsack with forbidden list • A dynamic programming algorithm • KPFL(I,W,S) := max{KPFL(I-1,W,S), KPFL(I-1,W-wI,S uinon I)} • O(n x W x 2n x L) • Need to improve that • Core algorithms

  26. Conclusion • We explored solution of 1D CSP using branch-and-price • Need to improve the solution to subproblem for overall improvement • Dynamic programming etc to solve subproblem instead of using IP solvers