1 / 11

X-ray Calorimeter

X-ray Calorimeter. Electrical Power System Bob G. Beaman 2 – 6 April, 2012. Subsystem Agenda. Overview Block Diagram Load Analysis EPS Curve Slew and Communication events Issues / Potential Risks / Future work EPS Summary EPS Trade Acronym List. Subsystem Overview.

diallo
Download Presentation

X-ray Calorimeter

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. X-ray Calorimeter Electrical Power System Bob G. Beaman 2 – 6 April, 2012

  2. Subsystem Agenda • Overview • Block Diagram • Load Analysis • EPS Curve • Slew and Communication events • Issues / Potential Risks / Future work • EPS Summary • EPS Trade • Acronym List

  3. Subsystem Overview • Electrical Power System Summary • Solar Array. TjGaAs at 28% efficiency, cosine angle 25 deg for Instrument off pointing. Two extra strings for reliability. Solar array doubles as a sun shade, with the array area required less than the sun shade area needed. A trade is provided to show the EPS impacts of increasing the pitch to 45 degand using single axis solar array drives. Spenvis Pmax 2.080E+14 used for the solar array degradation.. Solar array temp assumed to be 96 deg C. • Battery. Sized for the launch power loads. This design assumes 60 min from launch (spacecraft on battery power) to acquiring the sun and being power positive with a 43.1% DOD. Battery Power on Safe Hold will last about 40 min with no solar array power, longer if solar power is available. The Battery is internally redundant and will function to meet EOL requirement with one failure. • Power System Electronics (PSE). A independent PSE is assumed. The PSE will have redundant components to meet the class C redundance/relibality requirements. Fully redundant power feeds are provided for loads that need redundancy. • Harness. Harness is calculated based on a percentage of power sizing between the S/A, battery and PSE.

  4. Electrical Power Block Diagram I T T I I 1553 1553 I/F Special Commands Special Commands Test/Umb I/F FPGA Controller PSE Specific H/W Test/Umb I/F & PSE Specific Software FPGA Controller PSE Specific H/W Local Temp I/F & PSE Specific Software Local Temp I/F Double Insulated Bus Solar Array Module Output Output Output Module Module Module Battery Backplane/ Bus Cap X8 Battery Battery Module Module X2 Control Module Control Module BGB 100804

  5. Load Analysis

  6. EPS Curve Two extra solar array string for reliability First 50 days Cryocooler running at higher power

  7. ACS Slew & Communication Power • To cover the ACS slew, power may again needed form the battery. Load Analysis Slew Maneuver Mode requires 2461.2 watts. The solar array will need to deliver 2728.39 watts with current EPS losses*. The difference 267.2 watts needs to come from the battery. The current needed is 267.2/28v=9.54 amps. The 40ah battery, 40/9.54= 4.19 hours or 251 min. This is more than enough time for the power system to support this maneuver. • To cover the Communication, power may needed form the battery. Load Analysis Comm Mode requires 2062 watts. The solar array will need to deliver 2286 watts with current EPS losses*. The difference 52 watts needs to come from the battery. The current needed is 52/28v=1.86 amps. The 40ah battery, 40/1.86= 21 hours. This is more than enough time for the power system to support this Comm down link. *this calculation is bases on EOL solar array power. During earlier times, depending on the season, the solar array may have ample power and no battery discharge is needed.

  8. Issues / Potential Risks / Future work • Issues • Risk • Future Work. Load Profiles could be developed to further define battery operations during a Communications event and during ACS maneuvers.

  9. EPS Summary

  10. EPS Study * Does not include a iteration from any subsystem or the instruments.

  11. Acronym List PSE Power System Electronics DOD Battery Depth of Discharge SA Solar Array SAD Solar Array Drive EOL End of Life Ah Ampere hours TjGaAs Triple Junction Gallium Arsenide M Meters M2 Meters Squared Kg Kilograms deg Degree, Temp or angle depending on use LiIon Lithium Ion Battery

More Related