60 likes | 191 Views
‘ Octopuce ’ beam test. D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang Thanks to K. Dehmelt & U. Renz. LCTPC WP Phone meeting 119 December ç, 2010. Trigger/shutter and handshake schematics. Trigger setup. NIM→TTL. Out. NIM→TTL. Out. Out = NIM.
E N D
‘Octopuce’ beam test D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang Thanks to K. Dehmelt & U. Renz LCTPC WP Phone meeting 119 December ç, 2010
Trigger/shutter and handshake schematics Trigger setup NIM→TTL Out NIM→TTL Out Out = NIM TTL→NIM Out = NIM Out Veto T.U. ∞ Trigger BUSY Trigger TTL level to PC Reset Out PC BUSY Out Out T.U. 1.6 μs T.U. ∞ Shutter active low Start EndM Reset Out Shutter when generated by trigger TRIGGERS LCTPC WP phone meeting #119
Gas box • He/Iso 80/20 • Vmesh = 370V • TOT mode • Shutter time 0.5 s LCTPC WP phone meeting #119
TPC at 0T • He/Iso 80/20 • Vmesh = 380V • Time mode • Shutter Time: 100 us, start given by beam trigger LCTPC WP phone meeting #119
TPC at 1T • He/Iso 80/20 • Vmesh = 380V • Time mode • Shutter Time: 100 us, start given by beam trigger LCTPC WP phone meeting #119
TPC at 1T • He/Iso 80/20 • Vmesh = 400V • Time mode • Shutter Time: 100 us, start given by beam trigger LCTPC WP phone meeting #119