1 / 6

Beam test July 2012

Beam test July 2012. D. Attié , P. Colas, M. Dixit, P. Hayman, T. Maerschalk , A. Robichaud , J. Timmermans , W. Wang . LCTPC WP Phone meeting 154 July 19, 2012 . Thanks to our DESY colleagues of Ties’s team for their support at T24.

dillian
Download Presentation

Beam test July 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam test July 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans , W. Wang LCTPC WP Phone meeting 154 July 19, 2012

  2. Thanks to our DESY colleagues of Ties’s team for their support at T24. • Jan, Thierry, Carleton team and Saclay team participated in this beam test. • Everything went well during data taking.

  3. We finally mounted six modules on the endplate (5 just manufactured and one from 2011). • The whole detector works smoothly.  We took cosmic-ray and beam events with 1T magnet. • Data analysisis on-goingusingMarlinTPC.

  4. Data takingsummary • Z Scan (2.5cm-57cm) • Drift Field Scan(Standard field:230V/cm and low field:140V/cm) • Gain Scan • X Scan (upper and lower crack) • Phi Scan (angle: 0-15) • Peaking Time Scan (100ns-700ns) • Cosmics and beam, B=0 and 1T

More Related