An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the Multi-Pinch/Proto-Sphera Load Assembly Stamos Papastergiou, Franco Alladio, Alessandro Mancuso, Paolo MicozziCR-ENEA, CP 65, 00044 Frascati (Roma), Italy Outline of the Talk • Introduction to PROTO-SPHERA • Engineering Design and Analysis of PROTO-SPHERA • Multi-Pinch Experiment • Timetable • Conclusions

  2. Engineering Design of PROTO-SPHERA

  3. Main Breakdown features • Screw pinch (SP) formed by a hot cathode breakdown • Filling pressure pH~10-3÷10-2 mbar • Cathode filaments heated to 2600 °C • Ve~100 V applied on the anode • Initial electrode arc current limited to Ie~8.5 kA

  4. Design Philosophy • Simplicity, symmetry, conservatism. • Viewing capability and good access to electrodes. • All connections to PF coils from top and bottom flanges, external to Machine. • Bellows in coil feedthroughts for adjustment. • Operation and disruption (but no fault) conditions considered.

  5. Design Aims • Operationability, Reliability, Repairability of Machine. • Reliability of electrodes and avoidance of arc anchoring. • Minimise Technological Risks: provide appropriate elecrical insulation, avoid local coil overheating ( >100°C ) due to hot anode and cathode ( 12MJ, 2750°C ) • minimise electromagnetic stresses.

  6. Operating conditions Temperature 20°C Vacuum < 1•10-7 mbar (predicted outgassing rate: ~3•10-5 mbar•l/s) Baking 80-90°C Adequate for water removal, coil protection; compatible to Viton O-rings Possibility of N2 1 mbar contact gas

  7. Machine Parameters Spherical Torus (ST) diameter 0.7 m Longitudinal Screw Pinch current 60 kA Toroidal ST current 120÷240 kA Plasma pulse duration 1 s Minimum time between two pulses 5 min. Maximum heat loads on first wall componenets in divertor region 2 MW/m2 , for 1 ms Maximum current density on the plasma-electrode interface 1 MA/m2

  8. Protection Componenets Thermal and Heat Transfer Behaviour Philosophy: collect the heat ( via radiation ) from the electrodes to black resilient componenet and then conduct or radiate it away in a controlled way. Hot spots are thus avoided. Danger: the hot cathode (less the anode) radiates at 2750°C with ~3.5MW/m2 and even a 10mm thick coil casing cannot sustain this power density for more than 0.5s without exceeding 100°C

  9. Thermal and Heat transfer Behaviour Solution: • Use of Cu componenets to collect or reflect the heat away from coils. Conservative (but symmetrical) design for the anode. Thermal mass of these components results in operational temperature < 100°C. Water cooled! Optimum design; i.e. one circuit/component, D~10-15mm, v~2m/s, duty cycle 5min. • Use of thermocouples in no water cooled componenets to avoid >100°C with frequent pulses; every 5min. • Use of 10mm divertor AISI 304LN plates. 2 MW/m2 for 1 s gives DT~120°C, sth~320MPa • Use of optical diagnostics to view the electrodes which are relatively easily accessible.

  10. Electromagnetic Forces and Stresses B=50T/s B=500G t≤1 ms Subdivision of Cu and 304LN plates to achieve ≤100 MPa of eddy current stresses. Unaccounted skin effects (t ~1ms) significant. Conservative prediction of eddy current effects. Electromagnetic forces in the coils (~x10 weight) require to be sustained.

  11. Predicted and Permitted Stresses ASME III-NB 3221 Stainles Steel Allowable Sm for 304LN 100°C : 200MPa [304L Sm~150MPa] Predicted e-m stresses : 320MPa Thermal (divertor) local stresses : 320 MPa (2 MW/m2 ,1s) Criterion 1 : 100 <200x1.5 Criterion 2 : 100320 <200x3 Copper Minimum required allowable at 100°C> 70 MPa (100MPa<70x1.5) Thus sy >115 Mpa and su > 230 MPa at 20°C i.e. Cu hardenned

  12. Multi-Pinch Experiment Multi-Pinch Experiment Provisional single anode Cathode START Vacuum Vessel Aim: verification of the arc formation & stability ~ START DimensionPinch Current Ie=8.5 kA(same of ProtoSphera) - PF-Coils do not need cooling

  13. START in Frascati Arrival May 2004 Disassembling October 2004

  14. Multi-Pinch Experiment: Phase I & Phase II

  15. ELECTRICAL CONDUCTORS Cu GAS W80%Cu ≤1000°C ANODE PHASE - ASSEMBLY

  16. ELECTRICAL CONDUCTORS Cu WCu WATER ANODE PHASE 2 - ASSEMBLY GAS

  17. ELECTRICAL CONDUCTORS GAS WCu WATER COOLED PROTECTION PLATES SECTION OF ANODE PHASE 2

  18. Protection Plate Cu W-Cu SECTION OF ANODE PHASE 2 SECTOR

  19. ELECTRICAL CONDUCTORS Water W Cu CATHODE - ASSEMBLY

  20. CATHODE - CROSS SECTION WATER COOLED PROTECTION PLATES W Cu 15 V Mo

  21. COIL PF2

  22. MultiPinch Coils Delivery: 04/06/2007 EURATOM, ENEA & ASG Personnell

  23. SECTION OF PF2

  24. ASG – Test of PF2 Coil

  25. MultiPinch Timetable • Delivery of Load Assembly *September 2009 • I.a Construction & Delivery Magnetic Diagnostics to ASG * April 2009 • II International Tender Action for Construction • of Power Supplies * March 2009 • II.a Delivery of Power Supplies * June 2010 • III Site Preparation *June 2009 • IV Services (Vacuum, Electricity, Diagnostics)*June 2010 • V Commissioning* December 2010 • VI First Plasma* December 2010

  26. CONCLUSIONS • There is high degree of confidence that the design, construction and reliable operation of PROTO-SPHERA are feasible • The Multi-Pinch experiment is being constructed to prove the formation and stability of the PROTO-SPHERA initial arc • The PF Coils have been delivered, while the Load Assembly is half way in construction using the START Vacuum Vessel • First Plasma can be obtained in December 2010 • PROTO-SPHERA can be obtained by simply adding components to Multi-Pinch