70 likes | 181 Views
Towards 104 Test Modules in CLEX (presentation based on several input from JP. Delahaye- C. Garion, C. Hauviller – H. Mainaud-Durand) . G. Riddone, 31.08.2009. What do we need before CDR . Address feasibility issues in an integrated approach
E N D
Towards 104 Test Modules in CLEX (presentation based on several input from JP. Delahaye- C. Garion, C. Hauviller – H. Mainaud-Durand) G. Riddone, 31.08.2009
What do we need before CDR • Address feasibility issues in an integrated approach • Establish coherence between existing test set-up and future test modules in CLEX • Prepare test modules for CLEX – if possible use components from stand-alone tests for test modules in CLEX Question: • what can be realistically done before CDR – two cases to be studied: unlimited and available resources? Action - Preparation of schedule and budget by module review in collaboration with technical experts GR, 20090831
Validation tests currently foreseen GR, 20090831
Proposed strategy for main linac two-module validation GR, 20090831
Test Modules 104 The chosen module types are representative of all module types GR, 20090831
In preparation- Schedule GR, 20090831
In preparation- Resources GR, 20090831