Opportunities by the Millions

Opportunities by the Millions. Patricia Gallagher EMS/P2 Team Leader Los Alamos National Laboratory. LA-UR 07-7709. Control Mechanisms. Treatment & Recovery. Other Recycling. In Process Recycling. Source Reduction. Who Implements P2/EMS. Waste Management Professionals.

dillon
Download Presentation

Opportunities by the Millions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Opportunities by the Millions Patricia Gallagher EMS/P2 Team Leader Los Alamos National Laboratory LA-UR 07-7709

  2. Control Mechanisms Treatment & Recovery Other Recycling In Process Recycling Source Reduction Who Implements P2/EMS Waste Management Professionals CO$T$ Technical Process/ Facility Staff

  3. Pre-EMS P2 • Before EMS, P2 was a guerilla effort: coerce, cajole, convince, beg • Not nearly as successful as a result • P2 fully integrated into EMS effort • LANL received ISO 14001:2004 third party certification in 2006 • P2 efforts have increased by orders of magnitude with EMS

  4. Remedy: LANL developed a P2-based EMS Required by DOE O 450.1 LANL certified to ISO 14001:2004 standard Governing Policy begins with Prevention Identifies significant environmental aspects & risks Directorates develop action plans to address risks Process creates institutional objectives and targets Waste reduction Energy and Fuel Conservation Equipment & Materials Disposition Zero Liquid Discharge Compliance P2 Program provides upstream implementation mechanisms Aligning EMS objectives to key organizational priorities Working Groups led by P2 staff Environmental Management System

  5. Participation : Numbers and levels are key in Developing EMS • 2005-2006: Created at the worker level with upper and middle management support • Senior management environmental steering committee • 33 divisions as organizational units • Over 90 participants in the development of the EMS • Really engaged the brilliance of workers • Won the DOE P2 Star Award in 2006 • 2007: New contractor, massive reorganization • Even stronger senior management support • 16 directorates as organizational units with 69 divisions • Lost active division participation; middle management essential • Need to re-engage at a lower level again, higher level too removed • New worker safety teams provide a great opportunity • Won NNSA Award, “Integrating Safety and Security into EMS Lifecycle: A Body-Contact Sport”

  6. P2/EMS Program Process EMS Goals Waste generation #s EMS Action Plans Implementation Planning: Develop P2 targets Assess Risks Lean/Six Sigma Process Engineering Support GSAF Projects New Project/Design Reviews Lab Policies/Guidance/Toolkits Waste Volume Forecast Haz Waste Min Plan Communicate successes Preventive Action & Review Internal & External assessments Senior Mgmt Steering Committee Enviro-Grams LANL & NNSA P2 Awards/Newsbulletins

  7. Tools for Generators • Created tools: • ROI calculator • Clean out toolkits • EMS toolkit • Badges, posters • Presentations • ROI calculator is an eye-opening tool in terms of recognizing the cost of waste

  8. Lean/Six Sigma • Using new Laboratory improvement initiatives to include prevention in institution-wide efforts • Chemical management • Hazardous materials acquisition and disposition • Fleet management • Work planning • Safety and security planning • Lean/Six Sigma tools replace traditional P2 assessments

  9. Results were immediate • 2007 $1.2 million in investment provided $5.2 million in cost avoidance using only pilot results • 2007 projects totaled $17 million in cost avoidance • 2008 P2 awards involved 56 teams, over 300 staff and resulted in $5 million in cost avoidance • Cost avoidance tricky: staff and support systems still on the books, cost avoidances are transparent to managers • Real cost savings is in avoidance of management less than just disposal

  10. P2 Program Reach • Operational improvements • Steamer Lay-up: just produce process steam when needed, not 24/7 • Isolated duct work to keep from washing down an entire facility • Use of dissolvable PPE, extending use of launderable PPE • Chemical Lifecycle Management • Green Procurements • Construction/Sustainable Design: • CMRR soil reuse and recycle project: 150,000 cubic yards of waste diverted • LEED standards for large projects • Office waste • Restricting use of canned air and UPSs • Procedural • Improving work review and materials management processes

  11. Key Findings • Insert yourself into the biggest organizational problems • P2 staff are expert problem solvers and facilitators • Leverage everything • Spend more time planning • Lean/Six Sigma approach: 90-95% time planning, 5% execution • Get the right sponsorship • Define the process owner and all the players • Understand all the issues and upstream and downstream effects • Understand the strategy and tactics necessary for implementation • Couch benefits in a way that resonates with customers/sponsors

  12. Contact Information • Patricia Gallagher 505-667-2278 patg@lanl.gov