Proposal for measurements on RB.A81 on 1st September 2010

Proposal for measurements on RB.A81 on 1st September 2010. Emmanuele Ravaioli Thanks to A. Verweij. 25 August 2010. I_max = 2 kA; dI / dt = 10 A/s; Sector 12; 10-05-2010 22.08. Magnet 001  Blue Magnet 154  Red. QSO signals: Difference between magnet voltages.

dinah
Download Presentation

Proposal for measurements on RB.A81 on 1st September 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for measurements on RB.A81 on 1st September 2010 Emmanuele Ravaioli Thanks to A. Verweij 25 August 2010

  2. I_max = 2 kA; dI/dt = 10 A/s; Sector 12; 10-05-2010 22.08 Magnet 001  Blue Magnet 154  Red QSO signals: Difference between magnet voltages Power converter shut down First switch opening Second switch opening Emmanuele Ravaioli

  3. Understanding the behavior of the circuit during the power-converter shut down, with particular attention to the oscillations of the aperture voltages, and their difference. In each sector, about 60% of the dipoles present an unexpected behavior: during the PC shut-down, U_QSO reaches values ~5 times larger than the other magnets and than the values calculated by PSpice. Main goals of the measurements (1) Emmanuele Ravaioli

  4. Assessing the voltage across the switches (and to compare them later on once the snubber capacitors are installed). Possibly to upgrade the current switch model in PSpice. The proposed oscilloscope measurements are required because the oldQPS and newQPS have a sampling frequency that is too low (200 Hz and ~1 kHz) to properly analyse the transitory. It is important to understand the unexpected behavior of U_QSO, since this issue concerns about 60% of the magnets and the analysis of the present data shows that it is not related with the electrical or physical position of the magnets, nor with the magnet and cable manufacturers, nor with the chronology of installation. Main goals of the measurements (2) Emmanuele Ravaioli

  5. Oscilloscope connections(PS: the scopes will be insulated from the 220 V mains) Emmanuele Ravaioli

  6. The three magnets have been selected based on the behavior they showed during past tests: Magnets 42 and 115 showed a U_QSO signal during the PC shut-down transitory at 2 kA bigger than that at 6 kA. Magnet 41 showed a regular behavior, but has been selected to highlight the difference as compared to the other two magnets. Besides, the three magnets are physically close each other, and this will simplify the operations and reduce the number of the required insulator transformers. Magnet choice Emmanuele Ravaioli

  7. The measurements are scheduled for the night shift between 1st and 2nd September 2010, starting at 18.00 . Four tests will be launched; in each test, the current of the circuit will be raised with a dI/dt = 10 A/s. When I_max is reached (while the current is still raising), the power converter will be shut down (triggered by the QPS); after 350 ms, the first switch (pt1, middle of the chain) will be opened; after another 250 ms, the second switch (pt8, close to the power converter) will be opened as well. The values of I_max in the four tests are: 1 kA, 2 kA, 4 kA, 6 kA (actually a bit below 6 kA, because the PC slows down at the end of the ramp). If there is sufficient time possibly also tests with I_max = 3 kA and 5 kA can be performed. Another set of tests with dI/dt = 0 A/s (no ramping up) would also be interesting, at the same current levels; since the test at 6 kA requires a long standbye-period due the cooling of the dump resistors, it will be probably skipped. The following persons will be present: Knud Dahlerup-Petersen; Hugues Thiesen; Arjan Verweij; Bozhidar Ivanov Panev; Mike Koratzinos; Emmanuele Ravaioli; Zinur Chariffouline, ….? Schedule Emmanuele Ravaioli

  8. Emmanuele Ravaioli

  9. The PSpice model simulates well only the behavior of the ‘normal magnets’ Max U_QSO during PC shut down – 2 kA Emmanuele Ravaioli

  10. The PSpice model simulates well only the behavior of the ‘normal magnets’ Max U_QSO during PC shut down – 6 kA Emmanuele Ravaioli