1 / 8

INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought. INTERREG IV C-Project on Water Scarcity and Drought. INTERREG IV C-Project on Water Scarcity and Drought. Southern-Great Plain region Endanger by aridity and drought Endanger by inland waters. Water resources decreased

dixie
Download Presentation

INTERREG IV C-Project on Water Scarcity and Drought

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTERREG IV C-Project on Water Scarcity and Drought

  2. INTERREG IV C-Project on Water Scarcity and Drought

  3. INTERREG IV C-Project on Water Scarcity and Drought • Southern-Great Plain region • Endanger by aridity and drought • Endanger byinland waters • Water resources decreased • underground water-levels • surface outflow traditionally high-quality agriculturedecreased

  4. INTERREG IV C-Project on Water Scarcity and Drought • Environmental elementsdegradation • (Solodized) lakes and water-courses • Flora and fauna • Nagyszéksós-lake(125 hectare) • endangered (climate change) • multifunctional tasks (environmental • and water storage) • Complex developmentprogram • EU regional OP (ERDF 75%) • National cofinancing (25%)

  5. INTERREG IV C-Project on Water Scarcity and Drought • Main elements of the project • (Water Saving-Water Reuse) • Building the water replacement system • of Nagyszéksós-lake • (grey water use, wet-land) 3 Wet-land 2 Pressure pipe 1 Pump station

  6. INTERREG IV C-Project on Water Scarcity and Drought • Main elements of the project • (Water Saving-Water Reuse) • Rebuilding drainage routes • (increasing capacity of the drainage • system towards Serbia) 5 Water retention sluices ● ● 4 Channel dredging 4 Channel dredging 5 Water retention sluices ● ● ● ● 4 Channel dredging

  7. INTERREG IV C-Project on Water Scarcity and Drought • Main elements of the project • (Water Saving-Water Reuse) • Reconstructing the internal area of the • reservoir • (1.2 billion m3 water storage capacity) 12 hectare Constatnt water surface Periodical reservoir Total budget ~620.000 € Sluice 4 hectare Constatnt water surface Sluice

  8. INTERREG IV C-Project on Water Scarcity and Drought Thank you for your attention!

More Related