90 likes | 226 Views
Network Technology Area Updates APAN 2007 Xi’an China. Sureswaran Ramadass. Agenda. Measurement WG Network Security WG Lambda BOF SIP-H323 WG IPv6 WG. Measurement WG. Chairman: Kitamura Meeting held jointly with NOC Activity is merged with the NOC team
E N D
Network Technology Area Updates APAN 2007 Xi’an China Sureswaran Ramadass
Agenda • Measurement WG • Network Security WG • Lambda BOF • SIP-H323 WG • IPv6 WG
Measurement WG • Chairman: Kitamura • Meeting held jointly with NOC • Activity is merged with the NOC team • This Working Group is still contributing and providing presentations at workshops in APAN meetings.
Network Security WG • Chairman: Yoshiaki Kasahara, Yasuichi Kitamura • Network Security Workshop (29th 9:00 – 10:30) • 4 Speakers • 42+ Participants • Security WG Meeting (29th 11:00 – 11:30) • 30+ Participants • Discussion about sessions for next APAN meeting • One slot is requested to APAN Sec. for now • Consider a session proposal to Joint Techs
Lambda Bof • Chairman: Akira Kato, Te-Lung Liu • Four presentations were given in the session: • Erik-Jan Bos gave a nice presentation to cover not only NeitherLight update but also SURFnet update and GLIF activities. • Daniel Shu-Cheng Lin presented an update of TWAREN. • Min-Ah Kim presented an update of KORENet2/GLORIAD-KR. • Akira Kato presented an update of T-LEX and latest LSRs. • For global scope lambda networking, GLIF meeting will be held in Sep 17-18 Prague. • Some small of demonstrations are planned including 4K digital cinema transmission.
Network Security WG • Chairman: Yoshiaki Kasahara, Yasuichi Kitamura • Network Security Workshop (29th 9:00 – 10:30) • 4 Speakers • 42+ Participants • Security WG Meeting (29th 11:00 – 11:30) • 30+ Participants • Discussion about sessions for next APAN meeting • One slot is requested to APAN Sec. for now • Consider a session proposal to Joint Techs
SIP-H323 WG Meeting • 30th Aug, Xi’An, China • Member Status Update (70min)http://Download.ipv6.club.tw/APAN/ • CERNET, CN • USM, MY • LEARN, LK • UniNET, TH • TWAREN, TW • Working Group Name and Charter • WG Projects in the Future • SIP Peering between members • WG Chair Election • Term: 2007.9.1-2009.7.1 • Chair: Quincy Wu solomon@ipv6.club.tw • Co-Chair: Nimal Ratnayake nimalr@learn.ac.lk • Secretary: Stephen Kingham Stephen.Kingham@kingtech.com.au
Review Some Goals of SIP-H323 WG • Assist in Development of SIP in APAN Members • More people are interested in SIP. For example, in Network Research Workshop on Aug. 27: • The design, comparison and current status of TWAREN voicemail systems download • A Scalable Multi-Server Cluster VoIP System download • Design and Implementation: Large-scale IPv6 Multimedia Communication System based on SIP download • Tutorials to build SIP servers, identify and involve local organisations at the APAN Meetings • 2004.7 Cairns • 2005.1 Bangkok • 2005.8 Taipei • 2006.1 Tokyo • Co-ordinate SIP Peering between Members and Internationally
WG Project: International Peering • Many members have deployed domestic SIP services, and are showing strong interest in extending international connection. • Audio, Video, Presence, and Instant Messages. • Committed Participants in Phase 1 (2007.9-2008.1) • Nimal (LEARN-LK) • Hewu Li (CERNET-CN) • Sinchai (CNR-TH) • C.N. Yang (TWAREN-TW) • Ceejay (ASTI-PH) • CW Tan (USM-MY) • James (AARNet-AU) • A hands-on workshop may be held before the Hawaii meeting. • Administrators will meet together and configure their servers. • Coordination and information collection will be conducted before that. Possible trouble-shooting may be needed during the workshop. • A formal announcement will be made by the end of the Hawaii meeting.