ALFA station displacement LS1 Prepared by Eric Page (TE/VSC) Format and presentation by Mark Gallilee (TE/VSC)
Currentlayout A7L1 Not latestrevision: Update for ECR use
New layout A7L1 for LS1 Not latestrevision: Update for ECR use
Currentlayout A7R1 Not latestrevision: Update for ECR use
New layout A7R1 for LS1 Not latestrevision: Update for ECR use
Vacuum conclusion • Assumes no changeon the mechanical aperture (ø80 nominal); • Assumes no new components to manufacture; • Assumes no new materials(i.e. ferrites) – any new components must betested and approved by TE/VSC (6 months minimum if manufacturingrequired); • Installation 1-2 weeks as alreadyforeseen in LBV schedule.