Bario Asal & Arur Layun Micro-Hydro Project – INITIAL BRIEFING PACK

Bario Asal & Arur Layun Micro-Hydro Project – INITIAL BRIEFING PACK. Session Objectives. To introduce the Micro-Hydro Project Scope & Plan To describe the benefits of implementing the hydro To present the project outline Cost Estimates Project Funding

dolan-oneal
Download Presentation

Bario Asal & Arur Layun Micro-Hydro Project – INITIAL BRIEFING PACK

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bario Asal & Arur Layun Micro-Hydro Project – INITIAL BRIEFING PACK

  2. Session Objectives • To introduce the Micro-Hydro Project Scope & Plan • To describe the benefits of implementing the hydro • To present the project outline • Cost Estimates • Project Funding • To describe how the community will be involved in the project • Project Team – Roles & Responsibilities

  3. Outline • Why are we doing this? • What is a Micro-Hydro Power Plant? • What are the benefits to Bario Asal & Arur Layun community? • Where are we now and what next? • Who will be involved in the Project?

  4. Why are we doing this? • Provide the residents of Bario Asal & Arur Layun with electricity; • Elevate the standard & quality of life of the local community; • Encourage sustainable development.

  5. What are the benefits to the community? • A constant supply of electricity • Savings on the cost of buying diesel for diesel powered generators • Low environmental impact • Low noise and air pollution • Coupled with reforestation in the water catchments area, the project also aims to reduce the risk of flash floods in years to come.

  6. What is a Micro-Hydro Power Plant? • A small scale power plant that generates electricity using the energy potential of water. • Micro-hydro power plants convert the energy of flowing water into electrical energy. • The energy produced by them is renewable & the process does not emit polluting gases.

  7. Outline • Why are we doing this? • What is a Micro-Hydro Power Plant? • What are the benefits to Bario Asal & Arur Layun community? • Where are we now and what next? • Who will be involved in the Project?

  8. Where are we now? • A bank account at Maybank Boulevard, Miri has been set up in the name of JKK Kampung Bario Asal with over RM10k in the account • A preliminary site survey has been carried out and a project paper has been drafted; • Contacted various interested parties who have prior experience in executing similar projects in Borneo: • The Borneo Project Team – Focal Point : Jessica Lawrence • PACOS – Focal Point : Adrian Lasimbang • Seacology.Org – Via Jessica Lawrence • PACOS & Seacology.Org previous projects website

  9. Micro hydro Gantt Chart Q2 2007 Q4 2006 Q3 2007 Q2 2006 Q3 2006 Q1 2007 Q4 2007 Preliminary feasibility study Conceptual Design /Design Full feasibility study and Project Plan Excavation and civil works Build and test Electromechanical component installation Wiring and testing Implement Maintenance Training Mapping, Reforestation and Training Fundraising

  10. Cost Estimates – Total RM200,000

  11. Who will be involved in the project? • Everyone will be involved, at varying levels in the various phases. • Project Team • Will involve Local Project Team & PACOS Technical Advisors to effectively plan and execute the work • JKK Kampung Bario Asal Committee • Overall coordination of Bario Asal community efforts • JKK Kampung Arur Layun Committee • Overall coordination of Arur Layun community efforts • The Community • (refer next slide)

  12. Community Involvement? • Volunteer labor for excavation and construction works • Transportation of equipment and people to and from microhydro site • Food and lodging for technical team and volunteers • Mapping, marking and reforestation of water catchments • Maintenance personnel • Conduct workshop to train end users on responsible resource • management • Fundraising activities, sourcing of materials

  13. Local Project Team – Roles & Responsibilites Overall Project Coordinator – Plan & monitor project progress, liaise with NGOs & manage project team logistics; Fund Raising Committee – Organise fund raising activities, contact governments or NGOs or Companies or Individuals for donations & materials; Financial Controller – Manage project budget, focal point for donation, assist in raising funds; Bario Asal Focal Point – to source and organise local manpower & equipment, to assist in trainings, to assist in attaining food & lodgings for technical advisors & volunteers; Arur Layun Focal Point – to source and organise local manpower & equipment, to assist in trainings, to assist in attaining food & lodgings for technical advisors & volunteers. IT Focal Point – to upload and manage documents on the project website

  14. How to find us • Project updates will be posted at : http://briefcase.yahoo.com/bariohydro • Emails pertaining to the project can be sent to : Bariohydro@yahoo.com

  15. End of Slides Thank You

  16. Bank Account Details • Bank : Maybank Boulevard, Miri • Type of account: Savings account • Account Name: JKK Kampung Bario Asal • Account No.: 5942085 • Signatories: 1. Ribed Inan, 2. Sekan Berauk, 3. Aline Pasang Return to slide