1 / 7

Follow-Up Parallaxes of UKIDSS T-Dwarfs

Follow-Up Parallaxes of UKIDSS T-Dwarfs. Ricky Smart, Hugh Jones, Mario Lattanzi, David Pinfield, Dafydd Wyn Evans UKIDSS Cool Dwarfs Science Working Group. Why Parallaxes. Luminosity Space velocity Resolve model degeneracies e.g. surface gravity and metallicity

donat
Download Presentation

Follow-Up Parallaxes of UKIDSS T-Dwarfs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Follow-Up Parallaxes of UKIDSS T-Dwarfs Ricky Smart, Hugh Jones, Mario Lattanzi, David Pinfield, Dafydd Wyn Evans UKIDSS Cool Dwarfs Science Working Group

  2. Why Parallaxes • Luminosity • Space velocity • Resolve model degeneracies • e.g. surface gravity and metallicity • Binarity and Outlier identification • H-R Diagram details

  3. Why WFCAM • Discovered –> Observable • First epoch image • Service/Flexible observations • Only 30min/target/semester • Not possible on smaller telescopes • Gaia only 1/6

  4. Why not WFCAM Absolute & Differential Distortions http://casu.ast.cam.ac.uk/surveys-projects/wfcam/technical/astrometry

  5. Long Term Testing • Compare 5 frames over 1 year • Median residuals X,Y ~ 10., 14. mas

  6. ...Pudding: ULAS 0034 • Discovery 10/2005 • Obs 12/2006–9/2008 • Distance ~14pc (75mas)‏ • Error ~10% • Centroiding errors high

  7. Future + Problems • Biggest problem pilot successful !! • 5-10 Targets ready by mid 2009 • Follow-up of other objects in WFCAM field • Full program ~30 targets (15h/semester)‏ • Parallax factor coverage • Scheduling manually • 3 year future needed • Elsewhere: CHFT, Cala Alto, TNG

More Related