1 / 24

ICT Construction Plan Evaluation and Reliability Assessment Part 2

ICT Construction Plan Evaluation and Reliability Assessment Part 2. Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana. Map Legend. Code for Base Plan and Construction Plan Projects Indicated on Maps BP08-036 = Project Number from 2008 Base Plan

donkor
Download Presentation

ICT Construction Plan Evaluation and Reliability Assessment Part 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning SummitJuly 29, 2008Astor Crown PlazaNew Orleans, Louisiana

  2. Map Legend Code for Base Plan and Construction Plan Projects Indicated on Maps BP08-036 = Project Number from 2008 Base Plan CP(2011) = 2008 Construction Plan and Expected In-Service Year DCP(2011) = 2009 Draft Construction Plan and In-Service Year BP08-036 CP(2011) DCP(2011) Project is in 2017 model Project is not included in model Background Color Indicates Projects’ Inclusion In Case

  3. NA NA DCP(2013)

  4. NA NA DCP(2013)

  5. Other Areas These concerns seen in real-time may be relieved by projects in the Base Plan, Construction Plan or Draft Construction Plan. • Hot Springs-Bismark 115kV FTLO El Dorado-Longwood 345kV (Base Plan Project) • Liberty-Gillsberg 115kV FTLO Franklin-Bogalusa 500kV (Construction Plan Project with ISD 2009) • Hartburg-Inland Orange 230kV FLTO Hartburg-Cypress 500kV (Draft Construction Plan Project with ISD 2010)

  6. Base Plan Development Next Steps • Stakeholder Comments • Discuss Stakeholder Comments at September LTTIWG • Present Draft Base Plan at October LTTIWG • Finalize Base Plan and Post January 2009

  7. Steve PurdyLead Engineer, ICT Planning501-614-3371SPurdy@SPP.org Jason RussellEngineer II, ICT Planning501-614-3354JRussell@SPP.org

More Related