1 / 13

Aries Wachyudi P056120032.41E

[DRAFT] : Prototipe Knowledge Based Decision Support System (KBDSS) dalam Pengembangan Sampel Benang Knowledge Based Decision Support System Prototype in Thread Sample Development. Aries Wachyudi P056120032.41E. Latar Belakang.

donnan
Download Presentation

Aries Wachyudi P056120032.41E

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. [DRAFT]: PrototipeKnowledge Based Decision Support System (KBDSS) dalamPengembanganSampelBenangKnowledge Based Decision Support System Prototype in Thread Sample Development Aries Wachyudi P056120032.41E

  2. LatarBelakang Pentingnyakesiapandalammemenuhipermintaanpasartekstil yang berkembangpesatmengikutitren fashion. Efisiensipengembanganprodukbaru (NPD – New Product Development) kritikaldalammencapaikeunggulankompetitif. Tekstilmerupakanbisnisberskalabesardengankontrakproduksi yang ketat.

  3. RumusanMasalah Intensifnyapenggunaanbahanbakupadaindustritekstildenganketerbatasansuplaisertabanyaknyafaktor yang mengganggutercapainyaproduction leadtime standard. Denganpengetahuan yang terbatas, seorangCustomer Service dapatgagaldalammembuatkeputusanmengenaiprediksikapansampelbenangdapatditerimakonsumen. Kegagalanpenerimaansampelbenangdapatmenurunkantingkatkepuasandankepercayaankonsumensertahilangnyapeluangbisnisdimasadepan. BagaimanaseorangCustomer Servicememilikiinformasi yang akuratdalammemprediksileadtimeproduksipemesanansampelbenangdengantepat.

  4. TujuanPenelitian MendisainprototipeKnowledge Based Decision Support System dalampenentuanprediksileadtimeproduksisampelbenang. MemberikanguidelinebagiCustomer Service dalammerekomendasikanleadtimeproduksipemesanansampelbenangkepadakonsumen.

  5. SampelBenang Dalamindustritekstil, produksidilakukandalambatchkontrak. Kontrakproduksispesifikterhadapjenisdanwarnabenangtertentu. Risetpreproduksimemerlukansampelbenangyang memenuhisyarat. Jadwalkontrakpengirimansangatketat.

  6. StandarLeadtime Specialty (benangkhusus) Fastrack/ prioritasutama: 2 days Normal: 5 days Apparel (benangpakaian) Fastrack: 1 day Normal: 7 days

  7. Model DSS Rule based reasoning (IF.. THEN) Leadtimeoperasisample development. Fast-track: Apparel, Specialty Standard: Apparel, Specialty Leadtime raw material delay time. Contract based: Import, local Normal Purchase: Import, local Case based reasoning Knowledge refinement bagisetiapsolusibaruuntuk problem berbedasepanjangrantai proses produksi.

  8. Model DSS: Case Based

  9. KerangkaAturan (Rules) Leadtimeketersediaan material. Contract basedvsnormal purchase. Import vslocal. Raw material: Grey, Chemicals, Dyestuff, MUM. Supporting material: Water. Leadtimeuntukmachine downtime Spare-part availability. Service provider response time. Electricity  Generator availability. Ketersediaan operator Riot  Outsourcing. Leadtime process setup untukprodukbaru Specialty  benangkhusus. Apparel  pakaian. Contingency jikaterjadi disaster/ force majeur.

  10. Input DSS Basis data (Database) Product Receipe Stock availability Stock forecasting Basis pengetahuan (Knowledge Base) Service level agreement (SLA) with supplier: days New product setup: days Case based specific product: days

  11. KerangkaKerja DSS Database Knowledge Acquisition Knowledge Base (KB) Inference Engine Software Interface User Interface DSS Shell User

  12. Output DSS Leadtimeprediksi Specialty (benangkhusus) Fastrack/ high priority: ? Days Standard: ? Days Apparel (benanguntukpakaian) Fastrack/ high priority: ? Days Standard priority: ? Days

  13. TerimaKasih

More Related