WP 4 Past. Mechelen meeting: Stand alone modules; some not testable First formal reporting effort Followed by some additionally sent reports Den Haag meeting: Stand alone modules; some not completely finished Second formal reporting effort Followed by additional reports.

donnel
Download Presentation

WP 4 Past

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 4 Past • Mechelen meeting: • Stand alone modules; some not testable • First formal reporting effort • Followed by some additionally sent reports • Den Haag meeting: • Stand alone modules; some not completely finished • Second formal reporting effort • Followed by additional reports TARX - REGNET

  2. WP 4 Increments towards Toulouse e-Business (shop, proc.,auct.):debug and upgrade (VALT / ZEUS) Integration: done (VALT) Data entry/Search & Retr.: upgrade (AIT) e-Publishing: multimedia production ready (TARX) slide show in preparation (SR) Topic maps: refinement of the user interface (AIT) Portal: internationalisation (MOT and all language responsibles) Others? TARX - REGNET

  3. WP 4 Now • Toulouse: third formal reporting effort • Specific attention to: • Incremental changes of all technical modules • Newly parts of modules • Integration level of the modules • Internationalisation • + comparison with SWOT analysis Den Haag • + final judgement of constituting parts • Requirement: sufficient number of reports as valid base for assessment TARX - REGNET

  4. WP 4 Task data Normal planning: 01/07/02 – 31/12/02 Modified: xx/10/02 - 28/02/03 Task 4.1. Execution of the demonstration phase 55 pm TARX Demo’s, tests, operational issues, methodologies, CSCs Task 4.2. Refinement of systems and services 20 pm VALT All technical modules and integration Task 4.3. Analysis of the trial service, assessment and evaluation 6 pm IAT Evaluation of test and demonstration results BUT: all partners have to contribute TARX - REGNET

  5. WP 4 Person months TARX - REGNET

  6. WP 4 Planning - part 1 15/11/02 Referential environment 21-23/11/02 Meeting Den Haag 25-29/11/02 Refinement 01/12/02-31/12/02 1st iteration (demo + SWOT) 01/01/03-31/01/03 2nd iteration (demo + assess) 06-07/02/03 Meeting Toulouse 10/02/03-28/02/03 3rd iteration (demo + assess) 06/03/03 Deliverables sent to the Commission TARX - REGNET

  7. WP 4 Planning - part 2 10/03/03 Start preparation of Review meeting demo’s, slides, addenda to deliverables CSCs 26/03/03 Preparatory meeting Luxembourg 27/03/03 Final review meeting Luxembourg 28/03/03 Final REGNET meeting TARX - REGNET

  8. WP 4 Immediate “To do’s” Carry out demonstration and tests Produce adequate reporting Write referential environment Write final report contribution Establish CSC TARX - REGNET

  9. WP 4 Cultural Service Centres - CSCs REGNET CSC Europe E.E.I.G. Consortium Data entry e-Auction e-Procurement e-Publishing e-Shop Information engineering Knowledge engineering Portal Search/retrieval Membership Networked Regional Cultural Service Centres Services CSC concept Business Technical Content Participants XML Themes Context Multi-channel -level -lingual Infrastructure Membership or user Archives Art Galleries Museums Libraries Component Suppliers ICT-Companies Collections Market Makers Art & Antique Dealers Educational Institutes Scientists Tourists Visitors Official bodies TARX - REGNET

  10. END TARX - REGNET