EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 10, 2006
FY 2005 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 GLOBAL POSITIONING LOCATIONS MANHOLE REPAIRS TAB 2 TV INSPECTION TAB 3 ROOT CONTROL TAB 4 HYDRAULIC CLEANING TAB 5 EASEMENT CLEARING TAB 6 AERIAL STREAM CROSSING INSPECTIONS TAB 7 COMBINED TOTALS BY FISCAL YEAR TAB 8
TAB 1 MANHOLE INSPECTIONS/GLOBAL POSITIONING LOCATIONS INFLOW/INFILTRATION SECTION 4860 OF 5000 SYSTEM MAINTENANCE** 4 OF 80 ** MANHOLE INSPECTIONS ONLY
TAB 1 Manhole Inspections/Global Positioning Locations ** Manhole Inspections Only % Completed
TAB 2 MANHOLE REPAIRS CONTRACTED (RAISED) 2,069 OF 3,200 GENERAL MAINTENANCE 7 OF 40
TAB 2 Manhole Repairs % Completed
TAB 3 TV INSPECTION INFLOW/INFILTRATION SECTION 40,802’ OF 50,000’ SYSTEM MAINTENANCE 48,320’ OF 55,000’
TAB 3 TV Inspection % Completed
TAB 4 ROOT CONTROL PHASE 1 21,720’ OF 21,720’ River Cove Estates Nickajack Forest Russell Heights Pineland Springs Lake Shore Estates Covered Bridge Crossing Fox Fire Forest Laurel Cliffs Laurel Estates Briar Crest Lake Laurel Estates PHASE 2 383,283’ OF 383,283’ Casey Park River Cove Estates Heartford Woods Sherwood Estates Creekview Estates Shannon Springs Garrison Estates Civitania Woods Frontier Trails
ROOT CONTROL TAB 4 PHASE 3 102,291’ ALPINE FOREST CHIMNEY SPRINGS HOLLY OAKS MADISON HALL COCHISE ORCHARD RIDGE GREEN ACRES COBB HEIGHTS PHASE 4
TAB 4 Root Control
TAB 5 HYDRAULIC CLEANING GENERAL MAINTENANCE 178,959’ OF 400,000’ (COUNTY WIDE)
TAB 5 Hydraulic Cleaning % Completed
TAB 6 EASEMENT CLEARING PHASE 1 210,000’ OF 210,000’ PHASE 2 0’ OF 0’
TAB 6 Easement Clearing % Completed
TAB 7 AERIAL STREAM CROSSING INSPECTIONS INFLOW/INFILTRATION SECTION 321 OF 400 SYSTEM MAINTENANCE 8 OF 30
TAB 7 AERIAL STREAM CROSSING INSPECTIONS
TAB 8 Totals by Fiscal Year Linear Feet
TAB 8 Totals by Fiscal Year Each
Tab 8 Totals by Fiscal Year Each