EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: January 10, 2013. FY 2010 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1
E N D
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: January 10, 2013
FY 2010 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 MANHOLE REPAIRS TAB 2 TV INSPECTION TAB 3 ROOT CONTROL TAB 4 HYDRAULIC CLEANING TAB 5 EASEMENT CLEARING TAB 6 AERIAL STREAM CROSSING INSPECTIONS TAB 7 COMBINED TOTALS BY FISCAL YEAR TAB 8
TAB 1 MANHOLE INSPECTIONS INFLOW/INFILTRATION SECTION 762 SYSTEM MAINTENANCE 0
TAB 2 MANHOLE REPAIRS CONTRACTED (RAISED) 317 GENERAL MAINTENANCE 10
TAB 3 TV INSPECTION INFLOW/INFILTRATION SECTION 4,721’ SYSTEM MAINTENANCE 12,614’
TAB 4 ROOT CONTROL PHASE 1 PHASE 2
TAB 4 ROOT CONTROL PHASE 3 PHASE 4
TAB 5 HYDRAULIC CLEANING GENERAL MAINTENANCE 33,391’ (COUNTY WIDE)
TAB 6 EASEMENT CLEARING Quarterly Total YTD Quarter 1 20,232,712’ 20,232,712’ Quarter 2 Quarter 3 Quarter 4
TAB 7 AERIAL STREAM CROSSING INSPECTIONS INFLOW/INFILTRATION SECTION 216 SYSTEM MAINTENANCE 7
TAB 8 Totals by Fiscal Year Linear Feet
TAB 8 Totals by Fiscal Year Linear Feet
TAB 8 Totals by Fiscal Year Each
Tab 8 Totals by Fiscal Year Each
Tab 8 Totals by Fiscal Year Each