An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Snyder ISD Excellence in Everything Proposed New $28.8 Million Junior High $15 Million Bond Issue

  2. Long Term Goals • Create capacity to meet demands of current enrollment and modest growth • Move students out of portables at Stanfield and current Junior High campuses • Provide excellent facilities for our students and community for many years to come

  3. Why Build? Average JH Enrollment from 2004-2012 was 572

  4. Snyder Elementary School • 1200 student capacity • 1300 students at Elementary during 2012-2013 school year • Current Elementary Enrollment - 1062 • Moved Kindergarten (222 students) to Stanfield Elementary • 6 classes (1/2 of Kindergarten) in new portable building (temporary solution) • The district is using 15 classrooms in portable buildings

  5. Junior High Campus • Current Enrollment at JH campus– • 550 student capacity (excluding portables) • Current JH Enrollment – 597 • Goal – • Teach 2 grade levels (4th & 5th Grades) at current JH campus • Remove portable classrooms • Common areas such as cafeteria and gyms are more appropriate for 4-5 campus.

  6. Grade Configuration Scenarios

  7. Why A New 6-8 Junior High? • Current campus too small • Need a new 3 grade level campus to meet needs of currently enrolled students and allow for gradual growth. • Creates capacity needed at elementary • New elementary campus opened in 2007 • Construction of new secondary campus has not occurred since 1950’s.

  8. Site Location Land East of Airport • This 29.3 acre site gives the district the acreage needed to accommodate a junior high school.

  9. Estimated Grand Total All Projects

  10. How do we pay for it? • Total cost approximately $28.8 million • Bond Issue – asking voters to pay for $15 million • District will pay for costs above $15 million out of fund balance • Extend payoff from 2026 to 2034 assuming values remain consistent • No increase in tax rate

  11. Funding of New Bond

  12. Q and A Click Here to Visit the Q&A Section of SnyderISDBond.com