$15 MILLION BOND

$15 MILLION BOND BOND HEARING JUNE 10, 2009 AGENDA FOR 6/10/09 ALTERNATIVE POWER EXHIBITION BOND HEARING FINANCIAL OVERVIEW PLANNED WORK ITEMS PANEL DISCUSSION Q&A SESSION A Unique Opportunity $15,000,000 LEVERAGING $750,000 $750,000 COST TO TAXPAYERS

jaden
Download Presentation

$15 MILLION BOND

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. $15 MILLIONBOND BOND HEARING JUNE 10, 2009

  2. AGENDA FOR 6/10/09 • ALTERNATIVE POWER EXHIBITION • BOND HEARING • FINANCIAL OVERVIEW • PLANNED WORK ITEMS • PANEL DISCUSSION • Q&A SESSION

  3. A Unique Opportunity

  4. $15,000,000 LEVERAGING $750,000 $750,000

  5. COST TO TAXPAYERS • CONSTRUCTION COST $ 15,000,000 • STATE AID ESTIMATE @95% $14,250,000 • USE OF RESERVES $ 750,000 • NET COST: $ 0

  6. SOLAR POWER INCENTIVES • Long Island Power Authority • NYS Energy Research and Development Agency $750,000+

  7. COMPUTATION OF 95% AID • S. C. Basic Building Aid76.2% • Reorganization Building Aid 30.0% • TOTAL: 106.2% • Maximum State Building Aid 95.0%

  8. 2009 PROPOSITIONWORK ITEMS • HIGH SCHOOL • Reconstruct bus drop-off and parking-front of bldg • Masonry reconstruction • Replace greenhouse off of science prep room • Family and Consumer Science Classroom alterations • Library alterations • Replace alterations • Provide solar panels mounted on the roof • Other miscellaneous upgrades $3,300,000

  9. 2009 PROPOSITIONWORK ITEMS • MIDDLE SCHOOL • Create a new science center and planetarium • Convert 1 or both Industrial Art Rooms to Music • Replacement of existing Kitchen • Extend soccer fields to the west • Masonry reconstruction • Provide solar panels mounted on the roof • Other miscellaneous upgrades $4,100,000

  10. 2009 PROPOSITIONWORK ITEMS • F. P. LONG INTERMEDIATE SCHOOL • New field goal posts • New playground equipment and fencing • Replace antiquated roof top exhaust fans • Replace boiler room compressors • Provide computerized classroom heating controls • Replace window blinds • Provide solar panels mounted on the roof • Additional clearing to create fields • Other miscellaneous upgrades $2,340,000

  11. 2009 PROPOSITIONWORK ITEMS • VERNE W. CRITZ ELEMENTARY SCHOOL • Replacement of concrete curbing sidewalks • New playground equipment and fencing • Replace galvanized cold water piping with copper • Provide computerized classroom heating controls • Provide solar panels mounted on the roof • Other miscellaneous upgrades $1,525,000

  12. 2009 PROPOSITIONWORK ITEMS • KREAMER STREET SCHOOL • Replacement of concrete curbing sidewalks • Sidewalk and curb replacement • New Playground equipment and fencing • Improve lighting in parking lot • Modify athletics field drainage • Renovate playground area • Construct handicapped accessibility at rear entrance • Replace antiquated kitchen equipment • Replace galvanized pipe with copper • Provide computerized classroom heating controls • Provide solar panels on roof $1,895,000

  13. 2009 PROPOSITIONWORK ITEMS • BROOKHAVEN PRIMARY SCHOOL • Irrigate back fields • Replace one condensate tank in boiler room • Replace domestic hot water heater • Replace kitchen hot water heater • Renovate playground area • Replace Annex fuel oil tank • Stucco reconstruction at Annex • Replace roof leaders at Annex • Addition of drainage pools at the front of Annex • Provide computerized classroom heating controls • Install boiler freeze alarms • Replace all roof top exhaust fans • New vinyl floor tile in Annex • Provide solar panels on roof $1,840,000

  14. VOTEJUNE 16 MIDDLE SCHOOL 7:00 A.M. to 9:00 P.M.