1 / 57

ATLAS High Level Trigger/DAQ

ATLAS High Level Trigger/DAQ. INFN and Univ. di Genova, Lecce, LNF, Napoli, Pavia, Pisa, Roma1, Roma2, Roma3 S.Falciano - INFN Roma1. Outline. Breve status report del TDAQ di ATLAS con particolare riferimento al progetto HLT/DAQ e ai contributi italiani. Attività del 2004

dorie
Download Presentation

ATLAS High Level Trigger/DAQ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS High Level Trigger/DAQ INFN and Univ. di Genova, Lecce, LNF, Napoli, Pavia, Pisa, Roma1, Roma2, Roma3 S.Falciano - INFN Roma1 CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  2. Outline • Breve status report del TDAQ di ATLAS con particolare riferimento al progetto HLT/DAQ e ai contributi italiani. • Attività del 2004 • Aggiornamento sul lavoro svolto • Milestones 2004 • Piano finanziario : richiesta di sblocco s.j. CORE • Attività prevista per il 2005 • Sviluppi HLT/DAQ • Commissioning • Milestones 2005 • Richieste finanziarie CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  3. Attività prevista nel 2004 • Integrazione completa di tutte le componenti del LVL1 ad H8 (Muon+MUCTPI, Calo, CTP) • Integrazione del LVL2 e EF nel Test Beam Combinato ad H8 • Integrazione ad H8 di LVL1+LVL2+EF con elx dei rivelatori e il DAQ; run a 25 ns contrigger di primo livello generato dall’elettronica che funzionerà in ATLAS (LVL1 Calo+Muon + CTP) (“pipelined” mode). • ROD Crate DAQ per tutti i rivelatori (H8 e Commissioning) • Monitoring dei rivelatori e del trigger : infrastruttura e applicazioni • Test del software e delle configurazioni di trigger in laboratorio utilizzando i Testbed • Definizione e acquistodella “pre-serie” di HLT/DAQ ossia il “Modulo-0”. In parallelo : • Sviluppi degli algoritmi di trigger per Muoni (Muon Slice) e Pixel • Studi di Trigger Performance (rates, capacità di reiezione del fondo, etc.) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  4. Attività svolta nel 2004 • Per quanto riguarda il trigger di muoni di Livello-1 nel barrel, nel 2004 sono stati prodotti e collaudati i prototipi finali delle PADs, e' iniziata la produzione finale delle Splitter boards, e' stato realizzato, collaudato e integrato il prototipo finale di Link ottico e infine completato il disegno finale della Sector Logic e del ROD backplane. • Per il sistema HLT/DAQci si e' concentrati sull'integrazione del trigger di Livello-2 e dell'Event Filter nel Testbeam Combinato ad H8, lavoro attualmente in corso e gia' funzionante a fine luglio per gli aspetti di Data Flow e di Online Software. E' in corso l'integrazione degli algoritmi di trigger - con il meccanismo di steering previsto per l'esperimento - e di quelli di monitoring e di calibrazione. Si e' infine integrato il readout dei Pixel nel DAQ ad H8. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  5. pROS ROB L2PU AthenaMT Portable HLT “mini” testbeds L2+EF testbed Input file Contains the LVL2 result that steers/seeds the EF processing ROSE ROB ROB L2SV LVL2 & EB Networks EF testbed Input file SFI Emulator SFI DFM • EF testbed • can be implemented in a single host • used to test the EF algorithms • L2+EF testbed • requires 2 hosts • used to test the pROS communication between L2 algos and EF algos (the HLT slice online) EFD AthenaPT SFO CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  6. Software HLT • Il software HLT combina 4 progetti software in uno, con complicate inter-dipendenze • I due package DAQ (Online and Dataflow) • “Offline” e “HLT” releases • Riuso del software offline negli HLT • Beneficia del framework flessibile, dei servizi e degli algoritmi comuni • Stabilità versus nuove features • Piani futuri • Sono previsti ulteriori step di ottimizzazione basati sui risultati dei testbed di larga scala e del testbeam CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  7. Event Filter HLTSSW Processing HLT Core Software Task Steering Monitoring Service HLT Algorithms L2PU Application Data Manager HLT Algorithms ROB Data Collector Event Data Model MetaData Service <<import>> <<import>> <<import>> <<import>> Package Athena/ Gaudi Event Data Model Reconstr. Algorithms StoreGate Interface Offline Reconstruction Offline Core Software Dependency HLT Event Selection Software HLT Data Flow Software HLT Selection Software • Framework ATHENA/GAUDI • Reuse offline components • Common to Level-2 and EF Level2 Offline algorithms used in EF CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  8. LVL2 Muon Trigger: mFast speed increase Av. total time 2 ms • Main improvement comes from RPC and MDT data preparation: • Better use of roads defined by LVL1 trigger • total data-preparation time reduced to ~800 ms • Small improvement in algorithm time too • fewer MDT hits to handle and process saves ~60 ms • Data preparation and mFast now take about 1 ms each, total time about 2 ms. • Network data access time an additional ~0.2ms CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  9. G4 – PRELIMINARY Pt = 100 GeV h < 2.7 EF muon trigger: Trig- • Nuovorispetto ai risultati del TDR • Validata la ricostruzione di nuovi dati G4 con Trig-Moore (EF) • Esempio di algoritmo di ricostruzione offline adattato dagli autori per lavorare in una regione di interesse guidata dai risultati del LVL2 (“seed”) • Intera slice LVL1-LVL2-EF validata con “seeding” : • LVL1 RoIs seeds LVL2 • LVL2 result (LVL2 muon track encoded in raw “byte stream” format and appended to event data) seeds EF • EF unpacks this as part of the raw event and creates the seed objects • pT resolution from Geant4 simulation • Timing: ~150/280 ms (20/200 GeV muon) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  10. HLT at the Combined Test Beam • Two roles: • Service • Run monitoring algorithms in the LVL2 and EF farm. • Coherent histogram monitoring across the HLT system • Client • Aim to have the 2 slices (muon and e/) running from LVL1 to LVL2 and EF • Aim • Test as many aspects of the system as possible and collect enough information to evaluate the integration issues ahead of us • Status • LVL2 muon trigger being tested on simulated TB data (June) • LVL2 dataflow integrated into the test beam muon readout chain (July) • EF processing task running Athena (July-August) • tested remotely in test bed at Barcelona and on testbeam data in Pavia • Have a complete trigger dataflow test chain in place LVL1LVL2EF (End of August) • Full Muon slice in preparation : ready this week? Now a sort of “monitoring algorithm” is collecting and decoding data, fills and display histograms of MDT and RPCs • New ATLAS DB project set up : trigger and DAQ part of it. • Use of Muon ATLAS DB to exercise the access to configurations and conditions in one place from LVL1 to offline software. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  11. R C C R C C R O D R O D R O D R O D FileServer … … L2 Supervisors L2 Processors ROL ROL ROL ROL pROS Switch EF Processors Event Filter MAGNI cluster LVL1-LVL2-EF-DAQ vertical slice LVL2 HLT mini-rack L1 Muon L1 Calo LVL1 CTP RoIB LVL1A Detector … ROS ROS DFM EF SFI SFO Event Filter Control+ EB

  12. pROS ROB L2PU AthenaMT L2PU AthenaMT TB T/DAQ chain LVL1 R O S R O S ROD ROD ROD ROD Contains the LVL2 result that steers/seeds the EF processing RoIB ROB ROB ROB ROB L2SV LVL2 & EB Networks SFI DFM AthenaPT AthenaPT EFD EFD AthenaPT AthenaPT SFO CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  13. LVL2 Processing Task EFP EFD LVL1 Result Input Handler Event Queue SFO SFI LVL1 Result Event Selection Threads LVL2Supervisor LVL2 Result EF Data Flow InputTask LVL2 Processing Unit Sorting Task Counting Task PreProc. Task PT PT PT ExtPTs Task ExtPTs Task PT PT PostProc. Task Histogr.Task Output Task CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  14. DAQ Run Control showing the L2 partition up and running with L1, RPC and MDT CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  15. Event Display • Data from TB Run 600610 • Muon setup: RPC + MDT • Trigger: Hodoscope RPC High Pt Distribution of the hit MDT tube and RPC strips in the Z-T plane BOL RPC Pivot Counting room BML RPC Low Pt RPC Overlapping geometry is seen BIL Hodoscope is positioned here Beam CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  16. Beam profile • Beam profile in the BML station. • Correlation between RPCs and MDT is seen. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  17. BIL chamber: muon track hits are insid the peak m T s = Wire Pitch x cos(15°) Z MDT hit tube residual(mFast MDT pattern recognition) Compute Z of the hit tube centre; no use of drift time measurement. Z = (S Z tube)/n. hit tube Then compute the hit tube residual: DZ = Z tube – Z check the MDT data quality: electronic noise will broad the distribution. • Check the MDT data decoding: MDT data with low noise, must have the residuals peaked with the expected s.

  18. ZRPC 2 m m Z MDT ZRPC 3 RPC station 3 (High Pt confirm) RPC station 2 (Pivot) BML ZRPC 1 T Z MDT RPC station 1 (Low Pt confirm) BOL Z RPC-MDT Z correlation Compute the residuals between RPC and MDT clusters in BML and BOL. T Z DZ = (Z RPC 2 + Z RPC 1)/2 – ZMDT DZ = Z RPC 3 – ZMDT CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  19. RPC-MDT Z correlation The s is better thanks to the two RPC stations. cluster size effects in the third RPC. Residuals distributions shows correlation between RPC and MDT clusters. mFast pattern recognition is working! CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  20. Examples of Moore algs at the CTB Moore Algs are being currently usedfor the EF and TB data offline analysis: s = 61 mm Residuals of the segments fit Barrel sagitta (average: misalignment,width: resolution) s(sag) 63 mm CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1 mm

  21. DAQ nel Combined Test Beam • Items: • New Data Flow and Online Software releases • Integration of LVL1 and HLT (configuration, control, data collection, etc.) • Monitoring based on Information Service (Online Software) and Gatherer (for HLT to handle histos from a farm) • Aim • Test as many aspects of the system as possible and collect enough information to evaluate the integration issues ahead of us • Status • Detector integration (ROD Crate DAQ) • Pixel integrated • SCT problems with ROD, expected to be solved soon • TRT integrated • LAr integrated • Tile integrated • MDT integrated • RPC integrated • TGC integrated • LVL1 muon integrated • LVL1 calo integrated in lab, partially integrated at H8 in August • Detector Monitoring : done for Tile and MDT, RPC and Pixel in progress • HLT integration done (Data Flow and Online control) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  22. ROD Crate DAQ • Read-out dei rivelatori splittato su due componenti viste dal DAQ : • ROD Crate (responsabilità Hw/Sw : Rivelatore) • ROS (responsabilità Hw/Sw : DAQ) • Nuova implementazione Hw del ROS basata su PC invece che VME • Nuova implementazione del Sw del ROD Crate (ROD Crate DAQ) ora di responsabilità DAQ. Ciò uniforma la DAQ Locale nel ROD Crate per tutti i Rivelatori (supporto centralizzato per local processing, configurazione, event sampling, etc.) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  23. R C P R O D R O D R O D R O D NIC ROD Crate Workstation ROBIN ROBIN ROBIN RCD and ROS F.E. Electronics Event Fragments (Detector specific) Config & Control VME bus Event sampling & Calibration data … ROD Crates Config & Control Event sampling & Calibration data LAN (GbEth.) ROLs ROD Fragments • Total number of ROD crates: 90 • Total number of ROS PCs : 144 • Total number of racks : ~15” ==>All in USA15 (underground) … ROS PCs … PCI bus ROB Fragments ROS Fragments GbEth. L2 & Event Builder Networks CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  24. CTB – Pixel Commissioning Rod + TIM + SBC nel crate VME Modulo PP0 con Optoboard Boc S-Link fibre ottiche I/O CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  25. Pixel DAQ @ 100 kHz Il firmware del ROD è stato debuggato e molti problemi sono stati capiti e risolti. Il Pixel ROD è ora in grado di gestire un flusso continuo di dati a 100 kHz e di gestire correttamente la backpressure applicata dal ROS Module readout link @ 40 Mb/s Hits dal rivelatore LVL1 accepts ROD Busy – tempo morto indotto dalla scrittura dati su disco a livello del ROS CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  26. Pixel Box contenentesei moduli CTB – Pixel detector beam beam On-line monitor CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  27. Requirements on Monitoring System • Monitoring can be done at all trigger levels EVFLT LVL1 LVL2 ROD ROS SFI SF0 Different monitored information HW status physics quantities (invariant masses, Eflow ...) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  28. Monitor overall structure EMS Commands to MPs ROD MP LVL1 EMS Event Monitoring ROS OHistogram Service MP LVL2 EMS MP SFI MP Operational monitoring display (trigger rates,...) Event Filter Athena Gatherer Event Filter Athena Event Filter Athena Info Provider Information Service SF0 CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  29. Strategy for Monitoring MP File on disk Commands to MPs CORE EFS EMS Event Monitoring ROS OHistogram Service User lib User lib User lib Monitoring Process File Sampler Event Monitoring Sampler Online Histogramming Service Interactive Presenter Read Out System Detector Groups DAQ/Online SW Group Monitoring Group CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  30. Status of the project & people involved • A first version of the complete chain is working at the Combined Test Beam • User Detector groups are Pixel,Tilecal, MDT, RPC, Beam • Hope to integrate more detectors during CBT (SCT,...) • Ongoing developments on reference histograms, trigger selection, automatic, storing of histograms... Monitoring Developers : P. Adragna, A. Dotti, R. Ferrari, C. Roda, W. Vandelli, F. Zema. DAQ support : M. Caprini, S. Kolos. Users : M. Alviggi, I. Boyko, M. Brinet, D. Dedovitch, M. Della Pietra, L. Santi & people from Monitoring Developers. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  31. Monitoring demonstration CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  32. Monitoring at CTB – Tile + Beam CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  33. Milestones 2004 • Le milestones scelte implicano lo svolgimento del lavoro della Collaborazione italiana secondo : • i piani del progetto globale TDAQ (e le sue milestones) • step di complessità crescente e passaggi importanti sotto controllo • sviluppi generali che facilitano il lavoro d’integrazione di componenti simili (ad esempio i vari rivelatori) • Marzo 2004 : Integrazione Livello-2/Event Filter/DAQ su Testbed al CERN con Livello-1 in emulazione (algoritmi di trigger e HLT software framework descritti nel Technical Design Report) -> OK • Ottobre 2004 : Integrazione Detector/Livello-1/Livello-2/Event Filter/DAQ su Testbeam in modalità combinata (Pixel+LAr+Tile+MDT+RPC) ->In progress (~ 50%) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  34. Pre-series : When and where • LHCC milestone • Pre-series system installed and ready to be used31.03.2005--> Finalise technical specification NowPurchase 4Q04Installation 1Q05 • Several locations considered • Bdgs 32 - 40 - 513 and Point-1 • Point-1 preferred • The most realistic one (ROS rack in USA15, the rest in SDX1 as for final) • No extra investment required • Validate ALL functionality aspects, including real infrastructure • Assess readiness of infrastructure ~ 6 months earlier than required CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  35. Pre-series : purpose and scope • Pre-series System defined as • Fully functional, small scale version of complete HLT/DAQ • Made of components as specified for final system • Pre-commissioning phase • Validate the complete, integrated, HLT/DAQ functionality • Validate the infrastructure at Point-1 • Commissioning phase • Validate a component (e.g. a ROS) or a deliverable (e.g. a Level-2 rack) prior to installation and commissioning • Post-commissioning phase • Validate new components • Validate new software elements or full releases prior to use on experiment • As a TDAQ post-commissioning development system CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  36. 1EvFiltrack 1ROSrack 1L2rack R C C 1L2-miscrack 1EFIOrack 5.5 L2+EB Switch 1ONLINErack Pre-series - “Module-0” of final system - 7 racks(10% of final dataflow) SDX1 USA15 One ROS rack-TC rack+ horiz. Cooling- 11 ROS 44 ROBINs One Full L2 rack-DAQ rack- 32 HE PC One L2-misc rack-DAQ rack- 50% of RoIB - 3 LE PC(1pROS - 2L2SV) One central switch-DAQ rack- 128-port Geth for L2+EB Part of EFIO rack-DAQ rack- 10 HE PC(6 SFI - 2SFO - 2DFM) Part of EvFilt rack-DAQ rack- 12 HE PC Part of ONLINE rack-DAQ rack- 4 HE PC(monitoring) - 2 LE PC(control) All racks : one or more Local File Servers - One or more Local Switches CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  37. Costing evaluation steps • Write technical specifications of components. Currently available specs : • ROS and DAQ Racks (Rack and Cooler) • Rack mountable PCs, two profiles : • P1 – PCs for ROS racks, 6 PCI slots to host ROBins, 4U chassis • P2 – PCs for Fileservers or for Operations & Control, 1U (in DAQ rack) chassis • Local Fileserver and Control switch (not yet in formal way) • Market Survey to understand current costs vs technical specs • Offers available today sometime are not exactly what we need but they help to understand : • If our costing profile is STILL reasonable • How to proceed to have a product which matches exactly the technical specs (iterative process) • For some items we have offers which already meet the technical specifications • INFN has made a local price enquiry to contribute in finding products with the required technical specs and potential companies to be included in the final tendering. • Purchasing • We shall purchase via CERN but we can specify in detail our sharing (see “Summary”) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  38.       ATLAS  HLT/DAQ Pre-series •                           For internal use only (page for the ATLAS Referees) • Informations on the HLT/DAQ Pre-Series  • Introduction • Pre-series in a picture • Pre-series deliverables • INFN deliverables & costing  ("ROS Rack"  -  Partially filled "Online Rack"  -  Miscellanea) • Summary • Technical Specifications • Rack-mountable PCs for ATLAS DAQ applications  (Technical document, Market Survey Qualification Criteria and Questionnaire) • Local Fileserver • Local Switch CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  39. ROS Rack (Prices are in kCHF) (*) Rack and Cooler (5 kCHF), Power distribution and Control (8 kCHF) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  40. Total costing (Prices are in kCHF and k€)INFN contribution (~13% of Pre-series) Item Cost (kCHF) Cost (k€) ROS Rack (USA15) 104 69.3 DAQ Rack (SDX) 27 18 Miscellanea 12 8 Total 143 95.3 Richieste 140 89 CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  41. INFN cost profile (unit is kCHF) for the chosen categories (*) The funds for the staged part of the detectors (such as the Pixels) should fall in the year 2008. Therefore they might be subtracted from those of the years 2005-2006, which correspond to the full detector, and moved in 2008. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  42. Attività prevista nel 2005 • Per quanto riguarda il trigger di muoni di Livello-1 nel barrel, nel 2005 verrà sviluppata la produzione dell'elettronica on-detector nella prima metà dell'anno e di quella off-detector nella seconda metà, sarà definito il sistema finale di basse tensioni e inizieranno le procedure per la sua acquisizione. • Il sistema HLT/DAQ dovrà verificare le sue funzionalità e performance finali utilizzando la cosiddetta "Pre-serie" (~ 10% TDAQ slice) e allo stesso tempo sostenere le attività di commissioning dei rivelatori. A tale scopo verranno acquistati e installati i ROS di Pixel, Tile e Muon, interfacciati ai ROD Crate di questi rivelatori e integrati in una catena completa di acquisizione dati. Continueranno inoltre gli studi di Trigger Performance utilizzando il software di selezione più aggiornato e i dati delle nuove simulazioni in Geant4 con la geometria finale. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  43. Milestones 2005 • Le milestones sono state definite con i seguenti criteri : • Devono rispecchiare le fasi principali del progetto globale TDAQ • Devono accordarsi alle milestone interne (TDAQ) e a quelle esterne (LHCC) • Devono rispecchiare il coinvolgimento finanziario dell’INFN nel progetto 30.09.2005 LVL1 : 100% elettronica on-detector disponibile 31.10.2005 LVL1 : definizione sistema finale low voltage 31.12.2005 LVL1 : 100% elettronica off-detector disponibile 30.06.2005 HLT/DAQ : Installazione, test e uso della "Pre-serie" (~ 10% TDAQ slice) -> milestone LHCC 30.03.2005 (install.) 30.12.2005 HLT/DAQ : Installazione e test dei ROS di Pixel, Tile, Muon (interfacciamento al ROD Crate e integrazione nel DAQ) -> milestone ATLAS 30.09.2005 (ROS ready) CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  44. … as we do in test beam today:from a minimal setup …(The way to start with a new component) tested detector ROD crate off-detector readout electronics • Readout Driver (ROD) is detector-specific. • ROD Crate DAQ: skeleton by TDAQ, detector-specific parts by detector DAQ experts. • S-link connection to Readout System (ROS). ROS is a TDAQ PC. • Online Software for configuration, control, monitoring. SBC ROD S-link detector TDAQ Online SW ROS disk CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  45. ROS LVL1 calo ROS LVL1 mu ROS ROS RPC MDT ROS TGC ROS Tile ROS CSC ROS LAr monitoring run control SFI ROS TRT ROS SCT ROS Pixel … to the maximum multi-detector combination LVL1 LVL2 farm in H8 pROS Muon det. DFM data network (GbE) MAGNI farm in bdg. 513 Calo storage CASTOR (IT) SFO Tracker EF farm gateway in bdg.513 CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1 remote farms

  46. HLT/DAQ commissioning is driven by detector installation and commissioning, for which we have identified 3 phases: R C C R C C R C C R O D R O D R O D R O D R O D R O D 1 - ROD-Crate DAQ(Sub-detector FE commissioning) • ROD read-out on VMEbus by ROD Crate Controller … … … R C C R O D R O D VME … ROL ROL ROL ROL ROL ROL Ethernet ROS ROS 2 - ROD Read-Out(Sub-detector commissioning) • ROD read-out on Read-OutLinks with a minimal ROS Event Building ROS 3 - ROS Read-Out (Multiple partitions)(Sub-detector/TDAQ commissioning) • Multiple ROD-Crates read-out via ROL-ROS with a minimal EvBuilding CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  47. Piano finanziario 2005 CORE 2005 : • Detector Read-Out (Rack based, PC based, un rack contiene 11 PCs, un local file server, un local switch, un rack controller, power e cooling distribution. Il costo di un rack è di 110 kCHF. Vogliamo finanziare : • 11 ROSes per i Pixel • 26 ROSes per lo Spettrometro a Muoni • 8 ROSes per il Tile Per un totale di 5 racks (5 x 110 kCHF = 550 kCHF, 13% del R/O totale) distribuito su due anni. • Online (include le farm di processori per l’Online software, ossia Run_control, inizializzazione, etc. e dovrebbe rappresentare anche la frazione di monitoring dei rivelatori. Contributo del 20%) 2005 : 214 k€ + 25 k€ + 4 fte x 4 mesi comm. = 239 k€ + 16 mu comm. HLT/DAQ Roma1 : invent. 7 k Upgrade testbed lab HLT/DAQ (PC, CPU VME, Switch rete) apparati 214 k (320 k CHF) come da piano finanziario approvato da lla CSN1 (no deferral) HLT/DAQ Genova : invent. 10 k Schede DAQ (1 ROS + 1 ROBin) 5 k Single Board Computer per test con ROD HLT/DAQ LNF : invent. 3 k PC per sviluppi TDAQ CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  48. INFN cost profile (unit is kCHF) for the chosen categories (*) The funds for the staged part of the detectors (such as the Pixels) should fall in the year 2008. Therefore they might be subtracted from those of the years 2005-2006, which correspond to the full detector, and moved in 2008. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  49. Alcuni dettagli sui finanziamenti richiesti (1) • Genova :L'idea e' qualle di avere in laboratorio a Genova una fetta completa del read-out dei pixel, diciamo dal rivelatore ai processori di LVL2. Ovviamente il tutto serve sia per studiare il readout che per fare esperienza con gli algoritmi di trigger, entrambe cose di cui Genova ha la responsabilita' in ambito pixel. • Frascati :Il progetto e' di acquistare un PC da integrare nel rack della farm di calcolo, collegato in gigabit al resto della farm. • Roma1 :Mantenere in vita il testbed che ci ha gia’ permesso di essere pronti col DAQ dei Muoni lo scorso anno ad H8 e integrare gli algoritmi di trigger nel sistema globale (sostituire i PC che muoiono o diventano vecchi più qualche CPU VME per emulare i ROD dei rivelatori). Continuare le riunioni nazionali sul trigger di muoni che si sono rivelate molto proficue. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

  50. Alcuni dettagli sui finanziamenti richiesti (2) • Commissioning :Il DAQ e' coinvolto nel commissioning dei detector per integrare i sistemi di lettura e leggere i dati comunque generati (test pulse, cosmici, etc.). Le sezioni di Genova, LNF, Pavia e Roma1 partecipano nel 2005 al DAQ per l'integrazione dei ROD e dei ROS, l'event sampling e il Data Flow in generale. Ricordo che l'installazione dei ROS e' anche nostro compito visto che e' un acquisto CORE dell'INFN e riguarda i rivelatori che costruiamo. Si pensa che ogni sezione possa fornire 1 fte per 4 mesi, quindi: 4 fte x 4 mesi = 16 mu di ME Il lavoro si prevede inizi ad aprile e continui fino alla fine dell’anno. CSN1 Assisi - 23/09/2004 S.Falciano - INFN Roma1

More Related