MAHARASHTRA NATURAL GAS LTD, PUNE. CHALLENGES IN DEVELOPMENT OF ERDMP. Sagar Varma Senior Manager( Fire & safety). 28.09.2012. MAHARASHTRA NATURAL GAS LTD. MAHARASHTRA NATURAL GAS LIMITED (MNGL) A Joint Venture promoted by GAIL (India) Limited ; and
E N D
MAHARASHTRA NATURAL GAS LTD, PUNE CHALLENGES IN DEVELOPMENT OF ERDMP Sagar Varma Senior Manager( Fire & safety) 28.09.2012
MAHARASHTRA NATURAL GAS LTD. • MAHARASHTRA NATURAL GAS LIMITED (MNGL) • A Joint Venture promoted by • GAIL (India) Limited; and • Bharat Petroleum Corporation Limited To implement City Gas Distribution Project in Pune, Pimpri-Chinchwad (including Hinjewadi, Talegaon & Chakan)
BARUCH DAHEJ HAZIRA SURAT NAVSARI GAIL’S TRANSMISSION PIPELINES VALSAD VAPI SILVASA • DAHEJ – URAN PIPELINE • DABHOL – PANVEL PIPELINE • GHOTAWADE – CHINCHWAD PIPELINE DAHANU NASIK APTI BUDRUK SAFALE VASAI BORIVALI HAJIMALANGWADI TROMBAY PANVEL GHOTAW`ADE URAN IIL THAL CHINCHWADE AMBEWADI PUNE USAR DABHOL
DFR prepared by MECON in 2002 MoP&NG allocated 0.4 MMSCMD APM Gas to Pune City in April’2004 Date of Incorporation - 13.01.2006 Date of Commencement of Business - 24.03.2006 Authorised by PNGRB on 15.04.2009
19 Bar Steel Network Mother Station Chinchwad City Gate Station DRS 4 Bar PE Network 100 mbar PE Network 21 mbar CU Network GI Installation Service Regulator Domestic Kitchen
Customer Base Hotels/Small Commercial 13 commercial Domestic 4000 customers Vehicles 24000 auto 10000 cars 530 buses Industrial 37 nos.
Major Challenge • CGD companies operate as utilities and operate in city conditions. • Our typical response to emergency is based on customer complaints.
Major Challenge • Common regulation for midstream as well as downstream.
Documentation challenge • Old ERDMP reformatted to include all the 30 points of regulation, 9 schedules and 7 checklists. • Supports in the form of annexure included to give sense to the content
Documentation challenge To include • Risk analysis and consequence mapping. • Collection of data from various departments
challenges • Site visit and mockdrills • Three mockdrills conducted in span to 2 hours. • resource constraints. • Offsite department involvement
Other challenges • Perception of TPI delegates • Repeated Micro level changes
contents Other Challenges • Flow of document • Longtime taken for each stage of accreditation Foreword Definitions Executive Summary 11 chapters ( covering each and every schedule) 20 Annexures 7 Checklists
Benefits of the exercise • Involvement lead to knowledge up gradation • Various areas of safety management system come to surface • Comprehensive documentation • Knowledge sharing with other CGD • Tying of loose ends