90 likes | 174 Views
City projects. Buenos Aires City. ICT Industry. Law 2.972 - PROMOTION OF THE ICT COMPANIES OF THE CITY OF BUENOS AIRES (December 2008). Industry definition Geographic location Tax exemptions Infrastructure Education. 21 settled companies 2.763 HR 50.930 M2.
E N D
City projects Buenos Aires City
ICT Industry • Law 2.972 - PROMOTION OF THE ICT COMPANIES OF THE CITY OF BUENOS AIRES(December 2008) • Industry definition • Geographic location • Tax exemptions • Infrastructure • Education • 21 settled companies • 2.763 HR • 50.930 M2 CURRENTLY WORKING ON • Optical Fibre Promotion Law • Land Use Law. • Infrastructure and Security Master Plan • CMT – Metropolitan Technology Centre • Subway Recyclable buildings: 63.250 m2 Lots: 101.274 m2 Storehouses: 178.694 m2
Audiovisual Industry CinemaTVAdvertisingEntertainmentVideogames LAW - PROMOTION OF AUDIOVISUAL ACTIVITIESIN THE CITY OF BUENOS AIRES AUDIOVISUAL ACTIVITY = STRATEGIC INDUSTRY • The Government as facilitator. • Industry internationalization. • Tax benefits for SMBs • Banco Ciudadcredit lines • Tax benefits • Development of a cluster • Boost educational training AUDIOVISUAL ACTIVITY = STRATEGIC INDUSTRY AUDIOVISUAL DISTRICT CHARACTERISTICS • District area: 642 Ha. • Cementery: 90 Ha. • Lots ex AU3:8 Ha. • GCBA Offices:2.5 Ha. • Conectivity:Subway, railways, buses.
Design Industry • STAGES OF THE PROJECT • 1st Stage – Positioning of the CMD (2010 - 2011) • 2nd Stage – CMD Surroundings (2010 – 2012) • 3rd Stage – Priority Subzone (2011 – 2013) • 4th Stage – Design District (from 2013 onwards) CMD - METROPOLITAN DESIGN CENTER Total Surface 13.600 m2 The CMD is a public institution created to provide assistance to companies, designers and entrepreneurs in order to improve their competitiveness through design and innovation.
Lots in Catalinas 35.500 m2 Surface: 4.932m2 POSSIBLE USES • Offices • Malls • Hotels (any category) • Commercial area • Residential 6.000 m2 Av. L N Alem Av. San Martín 52.000 m2 38.000 m2 Av. Córdoba 3 2 1 Av. Madero 9.000 m2 6.500 m2 1 3 2 Surface: 3.628m2 Surface: 5.857m2
Hospital unification 34 hospitals under the jurisdiction of the City Government The unification will allow hospitals to share main services. • 1st Stage:F. Muñiz(infections), B. Udaondo (gastroenterology), M. Ferrer(pulmonary rehab). Unification will take place in the area of the Muñiz Hospital. • 2nd Stage:J. A. Penna and Dr. T.Alvarez.
Relocation of the City administration List of main City buildings • Edificio del Plata • Beruti 3345 • Esmeralda 638 • Viamonte 860 • Bolívar 191 • Balcarce 360 • Carlos Pellegrini 313 • Uruguay 454 • Uruguay 428 • Tacuarí 138 • Paseo Colón 255 • Córdoba 2222 Estimated area 150.000 m2 Civic Park Project • Extension: 37,7 ha. Today this area is occupied by the Borda and Moyano Hospitals and the Rawson home for children. • Total necessary surface:300.000 m2 • Recycling of existing buildings + Construction of new ones
Waste management The collection of urban solid waste is regulated by CEAMSE – a tripartite entity formed by the national government, the government of the Province of Buenos Aires and the Government of the City of Buenos Aires. • Buenos Aires’ City: 5000 tons of waste daily. • Disposal of waste mainly in landfills in the outskirts of the City nearing the limit of their capacity. • Law 1.854 – Progressive removal of landfills. “Cero Waste” program. • SOME TECHNOLOGIES FOR WASTE TREATMENT • (based in 3500 ton of USW) • Waste to energy • Requires 8 has • Amendments in the regulations in force • Anaerobic Bio-Digestion • Requires 22 has • Combination of Waste to energy + RecoveryInstalment of materials + Anaerobic Bio-Digestion • Requires 18 has • PROGRESSIVE REDUCTION OBJECTIVES • (basis: 2004 = 1.497.656 tons of waste sent to landfills) • 2010: 30% • 2012: 50% • 2017: 75% • 2020: Prohibition of the final disposal of recyclable and usable materials.