90 likes | 237 Views
Overview. Extraction tests : TT40 and TT60, week 21 controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity, injection sequencing TL tests : TI2 and TI8 to downstream TEDs, weeks 23, 26
E N D
Overview • Extraction tests: TT40 and TT60, week 21 • controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity, injection sequencing • TL tests: TI2 and TI8 to downstream TEDs, weeks 23, 26 • instrumentation, controls and data, energy matching, trajectory, DFS, optics, aperture, multibunch • Injection tests: TI2 and TI8, injection regions to LHC collimators, weeks 36, 37 • instrumentation, controls and data, trajectory, DFS, optics, aperture, dispersion matching, coupling, kicker waveform
General issues • TT40/60 • TT40 interference with CNGS in W21 – move TT40 date or block 4-8 hours from CNGS programme? • “high intensity” beams and full LHC cycle ready in SPS for SPS W21? • Special conditions for high intensity to upstream TEDs – e.g. limit on total p+? • All conditions available for testing filling patterns and injection sequencing? • TLs • Follow-up with LHC experiments, LHC access, LHC shutdown, etc. for TL tests… with OP - confirmed as Rossano? • Multibunch requirements for BI – 12 pilots OK? Experiments? • High(er) intensity beam to downstream TEDs? • Injection tests • Scope of injection tests – plan for beam 2 to IR6 with LBDS? • Second injection test presently scheduled w/e of W37 but Jeûne Genevois (again). Can we aim at for TI8 29/30th aug, TI2 5/6th sep?