Project Estimates

This project estimates the costs, schedule, and resources needed for a ski trip. Estimating is important in project management as it establishes trust, manages expectations, and determines project funding. Learn about different estimation methods and how to increase estimate accuracy.

doutlaw
Download Presentation

Project Estimates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Estimates 2/11/2008 By Mark Lutgen

  2. Why is estimating important to a PM? • Establishes trust and credibility in YOU • Sets and manages expectations • Project funding depends on the estimates • Projects rarely have an open check book • Project contacts depend on the estimates • Project profitability is at risk Estimates define probable outcomes for future activities

  3. Estimating Includes: • Project costs • Project schedule • Project resources You already know how to estimate…

  4. Our project – Ski Trip • Scope • 7 skiers / riders and their families • 3 days (departure to return) • Location TBD • Project Manager is responsible for organizing and paying for transportation, lodging, lift tickets and lessons (no meals, entertainment or equipment)

  5. Our project – Ski Trip • Objectives (determined through interviews) • Want to learn how to ride (get down a green run without falling) • Want to have a luxurious spa experience (like the spa at the St. Julien) • Want to get a break from the project and not talk about work for three days • Want child-care for my young kids while my wife and I ski together • Budget is $12,000

  6. How much will it cost? • Transportation $? 1 @ $? ea way + gratuity • Lift tickets $? ? @ $200 for 3 day pass • Lodging $? ? rooms (2 per room) @ $?/night • Lessons $? ? @ $90/day for group lessons • Subtotal $? • Total $?range +/- 20%

  7. How long will the trip take? • Load Bus 0.5 hr • Drive time 3-5 hrs • Rest break 0.5 hr • Unload / check-in 1 hr • Sub total 5-7 hrs • Reserve 1 hr • Total 6 – 8 hrs each way

  8. You already know how to estimate • What you may still need… • Process / methodology • Organization and format • Effective use of estimates • Nuisances • Industry specific information • Practice and experience • Delegate where appropriate

  9. Types of estimates • Analogous / Benchmarks • Similar projects • Scale to fit (e.g., 100.6) • S.W.A.G’s • Very common when Rough Order of Magnitude is ok • Parametric • $ per unit • hr per unit • Bottoms up • Detailed • WBS driven • Greatest $$ to develop We will focus on this type Each method has a time and place

  10. Understand the estimate accuracy • State estimate as a range • Use contingency or reserve to increase confidence of single point estimates (Monte Carlo) Accuracy is proportional to time / effort invested

  11. Where to start… • Scope definition • Deliverables • Work required to achieve business objective • WBS • Define the activities and deliverables • Decompose to a level needed for the estimate • Bottom’s up estimates vs Analogous estimates

  12. Time & Resource Estimates

  13. For bottoms-up-1st - define the activities • Identifies deliverables at lowest level of the WBS • If WBS is not available… brainstorm w/ team • Decomposed to schedule activities • Basis for estimating, scheduling, and controlling • Rolling Wave Planning • Near term – activities detailed • Far term – activities high level • Decomposition • Breaking work into smaller more manageable pieces

  14. Use a Work Breakdown Structure

  15. 2nd - define sequence • Identifying logical relationships between activities • Precedence Diagramming Methods (PDM) • Activity on Node (AON) • Arrow Diagramming Method (ADM) • a.k.a. Activity on Arrow (AOA) • Start / Finish relationships • Finish to Start (most common) • Start to Start • Start to Finish • Finish to Finish • Lead = Starts earlier • Lag = Starts later / delayed start For small projects, identification, sequence, and development may be concurrent

  16. Model Activity Sequences Activity on Node B E A C D Arrow Diagramming Method - Dummy Activities B A C D E

  17. 3rd - estimate resources • What resources required • Amount of each resource required • Resources • People • Equipment • Materials

  18. Activity Resource Estimating • For each activity… • How many resources are needed • How long • Expert judgment / experience • Use team members • Use Functional managers • Published estimating data • Bottoms up estimate • Break it down into smaller and smaller pieces until you can establish a ‘good enough’ estimate • Benchmarks / similar projects

  19. 4th - estimate duration • The goal is to determine the duration of each activity • Number of resources • Elapsed time • Expert judgment (Delphi technique) • Analogous – (similar projects) • Parametric – (regression, scaled, time/unit) • Three point estimate • Program Evaluation and Review Technique • PERT = 1/6[Pessimistic + 4(Most Likely) + Optimistic] • Std Dev = (P-O)/ 6

  20. 5th - build / develop schedule • Iterative process to develop start / finish dates • Monte Carlo Analysis • Resource Leveling • Moves resources from non-critical to critical path • Schedule Compression • Crashing (Increase $$ to reduce duration of CP) • Fast Tracking (Overlapping phases) • Critical Path Method • Float (a.k.a. Slack) - Total Float, Free Float • Early Start/Finish • Late Start/Finish • Forward / Backward paths Consider schedule reserves on the critical path

  21. Schedule Development – CPM Examples…

  22. 6th – Compile resources • Roll up resources across entire project • List resources by time period • Scheduling software does this for you 

  23. Cost Estimates

  24. Cost estimating • Break into smaller and smaller pieces until you have a benchmark or basis that provides an acceptable level accuracy or confidence • Benchmarks • Usually high level (parametric) • Basis • Usually itemized or based on deliverables • Use basis and adjust for your specific requirements • Organize budget in alignment with WBS • Activity based • Resource based *

  25. Where do you get the information? • Historical projects • Experience • Project Database • Vendors • Literature / Trade Journals • Internet • Catalogs • Experts / Consultants Build your own data base / file

  26. Be thorough…. • State assumptions • Helps others review • Helps PM manage changes • Identify your biggest budget risks and mitigate • State exclusions • Include all applicable costs • Travel, training, taxes, freight • Include project benefits (savings) too!!! Budget busts are usually items that we not included

  27. How to use contingency… • Always use it (contingency) • Use contingency to cover uncertainty in approved scope • Get additional funding for new scope • Line item vs. bottom line contingency • Percentage depends on level of certainty • Rule of thumb – use 10% if scope is defined • Learn your industry norms • Engineering projects • 50-100% with ROM • 10-30% after 20-30% design • 5-15% after 60-90% design

  28. How to use contingency… • Use Monte Carlo for more robust method • Develop nominal estimate (50% confidence interval) • Develop risk register • List risks • Best / probable / worst case $$ impact • Run Monte Carlo simulation • Contingency / Mgmt Res = 90% interval – 50% interval Mgmt Reserve Contingency Base Estimate 50% Confidence 90% Confidence Use if high degree of certainty is needed

  29. Delphi technique is good in a pinch • Delphi • Process to converge expert opinions • Information is not available elsewhere (i.e., 1st of a kind) • Information is costly to develop • Real example of program cost estimates… • Delphi took < 5 hours • 5% Eng required over 1000 hours • Which is better?

  30. Estimating is simple, doing it well is the challenge! • Project costs • Project schedule • Project resources