Phase 1 Problems

Phase 1 Problems. Small size 20 to 150 methods 10 to 20 agents Problem Classes One static + one dynamically arriving problem Uncertainty in duration/quality Too much work to do (only class with more than 70 methods) Non Local Effects (hard enables + soft facilitates) Syncronization. 1.

draco
Download Presentation

Phase 1 Problems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phase 1 Problems • Small size • 20 to 150 methods • 10 to 20 agents • Problem Classes • One static + one dynamically arriving problem • Uncertainty in duration/quality • Too much work to do (only class with more than 70 methods) • Non Local Effects (hard enables + soft facilitates) • Syncronization 1

  2. Phase 2 • Much more complex scenario generator • mix and match various problem classes, now called templates • better control of the assignment of agents to methods • within a template & between problems • More dynamics (both new tasks & changes to old) • New NLEs (hinder, disable) • New QAFs (Sum-And, Exactly-One) • Much larger problems • 10–100 agents • 725–10,000 methods 2

  3. Experimental Environment • Scenario Generator generates random scenarios. • Each scenario contains one or more problems. • Problems are independent, except that they may overlap in time. Agents can only do one thing at a time. • Problems consist of Template Instances. • Templates comprise tasks and methods. • Methods are individual executable actions.

  4. Experimental Environment • Each problem, and some complex templates, are broken into a sequential set of time windows. • Each window has an earliest start time and a deadline. • We can independently control how tight these start time and deadlines are relative to method execution time and how much windows overlap with one another. • Non-local effects (NLEs) also are limited to be from earlier windows to later windows.

  5. Templates • Simple • Static single-window problems from Phase 1 • Syncronization • Single sinch point from Phase 1 • Dynamic Simple • Dynamically arriving simple single-window • NLE Chain • Multiple windows chained together with enables or facilitates • Recursive template for each window 5

  6. Templates • Multi-Synch • Multiple sych points under a single window • Enables Tracks • Multiple “tracking” tasks, each with a series of linearly enabled subtasks • Contingency • multiple “preparation” methods enable multiple “completion” methods. • A crucial task with multiple outcomes determines what “completion” method is actually needed at runtime 6

  7. Templates • Second Chance Dynamic • “preparation” task almost impossible, enables “completion” task. • an “easier” preparation task arrives, allowing an easier second chance at completion • Circular Soft NLE • Soft NLEs (facilitates, hinders) are set up in cycles, creating a hard optimization problem 7

  8. Simple Templates

  9. Syncronization Template

  10. Dynamic Template

  11. NLE Chain Template

  12. Multi-Synch Template

  13. Enables Tracks Template

  14. Contingency Template

  15. Second Chance Template

  16. Circular Soft NLE Template

  17. Experimental Classes [Phase 2] • General Mix • Negative Interdependence • Very Dynamic • Circular Soft Interdependencies • Tight Deadlines • Uncertainty • Contingency • Big Interdependence • 100 Agent Mix 17

  18. General Mix • Basic template mix for most problems • 10–70 Agents • 400–3000 Methods • 1 fast fallback methods • 2 redundant methods • Template Mix • Simple[Sum] • Simple[SumAnd] • Dynamic • NLEChain - Multi Synch - Enables Tracks - Contingency - CircularSoftNLE[facilitates] 18

  19. General Mix, 10 Agents, Actual

  20. General Mix, 10 Agents, Detail Enables Tracks Template NLE Chain (start) Circular Soft NLE Template

  21. Negative Interdependence • Simple Template with lots of hinders and disables 21

  22. Very Dynamic • Dynamic Template with changes to deadlines, release times, and quality/duration distributions Random changes to: Release Times Deadlines Quality Distributions Duration Distributions 22

  23. Circular Soft Interdependencies • Circular facilitation creates hard optimization problem 23

  24. Tight Deadlines • Simple Templates with Sum and tight deadlines (must use alternative fallback or redundant methods) 24

  25. Uncertainty • Simple and Dynamic Templates; high uncertainty in duration/quality; 20% method failure Uncertainty make scheduling difficult

  26. Contingency

  27. Big Interdependence • NLE Template Mix: NLE Chains, Enables Tracks, Circular Soft NLEs plus random NLEs

  28. 100 Agent Mix (actual) • Similar to General Mix without Dynamic changes 28