NMG – Project Charter. February, 5 2010. Project Objectives (Long-term) . Project Objectives (Current Phase) . Critical (Key) Success Factors . Flexibility Matrix .
E N D
NMG – Project Charter February, 5 2010
Flexibility Matrix *Note: In consideration of a fixed price project, Client and Vendor PM agree to proactively address any scope creep issues, to keep the timeline in check with cost of the project
Project Name • The name associated to the project plays a critical role in user acceptance and ownership of the system. • A Positive name helps with: • Change Management (people feel part of something new, and hence are more willing to change) • Ownership of the system (Users start contributing in a positive way) • Keeps a consistent image of the system • Drives a cultural message and lines up with corporate vision • What is our Project’s name? BPM with process names: • EC = Expense Claim • ABS = Advertising Billing System
Housekeeping • Project documents directory - svn/document • Annual Leave/Sick Leave/Communication • Project mailbox? mail group? bpmproject@nmg.com.hk • BPMN Training • Things to do while plan is being developed?
Testing Plan, Responsibilities & Methodology • What tools are used internally, classification of defects, tools to be used to track defects, test cycles, etc.
Training Plan, Responsibilities & Methodology • (User groups to be trained, training principles, training manuals, responsibilities, etc)
Go live – Production Readiness Procedures • (What sign-offs/approvals are required?, What IT polices are to be adhered to?, and such)