DIMR’s preparation for TCC2/TDC2 activities. DIMR’s in preparation. XTAX table motor exchange XTAX annual maintenance Collimator activities Vacuum repairs Target annual maintenance Crane modifications https://espace.cern.ch/rpps/wdp/docs/Forms. RP survey TDC2.
E N D
DIMR’s in preparation • XTAX table motor exchange • XTAX annual maintenance • Collimatoractivities • Vacuum repairs • Target annual maintenance • Crane modifications • https://espace.cern.ch/rpps/wdp/docs/Forms
Collimatoractivities • Collimator XCHV058 and XCHV070 removal and exchange • Vacuum leaksearch and fix (sectorfollowing TAX6 up to QWL080) • Protective caps installation on 3 XCSV • https://espace.cern.ch/rpps/wdp/docs/Forms
XTAX table handling • Disconnect grids • Disconnect cooling pipes • Disconnect motor cables • Move table to bunker area • Exchange motor • Re-install table + reconnect Grids, cooling pipes and motor cables First dose estimate First dose estimate