200 likes | 349 Views
HydroFly Flywheel. Gavin Abo Nate Stout Nathan Thomas. Hydrofly. Two Teams Flywheel Fuel Cell Adam Lint Chris Cockrell Daniel Hubbard. Sponsors & Mentors. Brian Johnson Herb Hess Satish Samineni. Design Review II: Final Design Review Outline. I. Introduction II. Objectives
E N D
HydroFly Flywheel Gavin Abo Nate Stout Nathan Thomas
Hydrofly • Two Teams • Flywheel • Fuel Cell • Adam Lint • Chris Cockrell • Daniel Hubbard
Sponsors & Mentors • Brian Johnson • Herb Hess • Satish Samineni
Design Review II:Final Design Review Outline I. Introduction II. Objectives III. Design Functionality IV. Schedule V. Budget VI. Questions
I. Introduction • Why is the project being done? • -To correct short voltage sags (a few seconds) to maintain a stable voltage to critical loads. • Why is this important? • -The shutdown of critical loads due to short voltage sags can be costly.
II. Primary Objective • Interface a flywheel to the AMPS with the ability to correct for voltage sags occurring on the AMPS. • Implement the design by Satish Samineni
Secondary Objectives • Spin a flywheel • Communicate between converters • Operate each converter with its own PWM • Provide power to AMPS • Operation Manual
III. Design Functionality • Organizational Chart • Block Diagram • Overall Circuit Schematic • Sub Circuit Schematics • Programming • Assembled • Documentation • Specifications
Interface a flywheel to AMPS to correct for voltage sags on the system Spin a flywheel Provide power to AMPS Communicate between converters Operate a space vector PWM scheme Operate a sine–triangle PWM scheme Sag Status Program the switching times calculation Program matrix math functions Program a Phase locked loop Program the triangle wave Program the sine wave look up table Organizational Chart
DC link startup power supply Generates positive DC voltage Generates negative DC voltage
What we have programmed Matrix math capabilities Space Vector PWM scheme Sag detector and corrector What we still have to program Phase Locked Loop Modify already programmed code to work with the measured inputs The Programming
What has been assembled Capacitor shorting bars Utility Cart What needs assembled DC link charging supply LEMS Safety Cover Transformer Assembled
Documentation • Test plan • Functional test plan • Specification test plan • Operators Manual • Poster
VI. Questions http://www.ece.uidaho.edu/hydrofly/website