Process Order Costing

Process Order Costing. Bab 6. Contoh soal : American Chair Company. Departemen Pemotongan. Departemen. Departemen Perakitan. Contoh – Departemen Pertama :. Produksi: Biaya:. Analisis Aliran Unit Secara Fisik. Barang Dalam Proses – Dep 1. Barang Dalam Proses – Dep 2.

Download Presentation

Process Order Costing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process Order Costing Bab 6

  2. Contohsoal:American Chair Company DepartemenPemotongan Departemen DepartemenPerakitan

  3. Contoh – DepartemenPertama: Produksi: Biaya:

  4. AnalisisAliran Unit SecaraFisik BarangDalamProses – Dep 1 BarangDalamProses – Dep 2

  5. AnalisisAliran Unit SecaraFisik BarangDalamProses – Dep 1 BarangDalamProses – Dep 2

  6. 1. AnalisisAliran Unit SecaraFisik Unit untukdihitung: Unit-unit padaawalbarangdalamproses 100 Unit-unit yang mulaidikerjakanselamaperiode 600 Total unit untukdihitung 700 Unit ygtelahdihitung: Unit-unit ygtelahselesaidanditransferkeluar: Mulaidikerjakandandiselesaikan 400 Persediaanawalbarangdalamproses 100 Unit-unit padapersediaanakhirbarangdalamproses (60%, 20%, 40%) 200 Total Unit ygtelahdihitung 700

  7. Perhitungan Unit Ekuivalen Jumlah unit x % Penyelesaian

  8. 2. Perhitungan Unit Ekuivalen

  9. PerhitunganBiaya Per Unit

  10. 3. PerhitunganBiaya Per Unit

  11. PerhitunganBiayaPersediaan • Yang Selesai (PersediaanBarangJadi) = • PersediaanBarangDalamProsesAkhir =

  12. Lanjutan…

  13. DepartemenPerakitan – DepartemenKedua Produksi: Biaya:

  14. AnalisisAliran Unit SecaraFisik BarangDalamProses – Dep 1 BarangDalamProses – Dep 2

  15. 2. Perhitungan Unit Ekuivalen

  16. PerhitunganBiaya / Unit Biayabahanbaku per unit BiayaTenagaKerja per unit Biayadari Departemen sebelumnya Biaya Overhead Pabrik Biaya per Unit = + + + = $ 49,92+ $ 12,00 + $ 5,00 + $ 18,00 = $94,92 per unit

  17. Lanjutan…

  18. AkuntansiuntukBahan Baku, TenagaKerjadan Overhead • BiayaBahan Baku BarangDalamProses – Dep. Pemotongan 13.608 BarangDalamProses – Dep. Perakitan 7.296 Bahan Baku 20.904 • BiayaTenagaKerja BarangDalamProses – Dep. Pemotongan 5.000 BarangDalamProses – Dep. Perakitan 9.210 BebanGaji 14.210

  19. Lanjutan … • Overhead Dibebankan Overhead Aktual: Pengendali Overhead $20.900 Utang Usaha (pajak, listrik, dan lain-lain) 7.400 AkumulasiPenyusutan – Mesin 5.700 AsuransiDibayardiMuka 500 Bahan Baku (bahanbakutdklangsung) 1.700 BebanGaji (tenagakerjatdklangsung) 5.600 Overhead Dibebankan: BarangDalamProses – Dep. Pemotongan 7.904 BarangDalamProses – Dep. Perakitan 11.052 Overhead Dibebankan 18.956

  20. Jurnaluntukmencatat transfer biayadari Dep. Pemotonganke Dep. Perakitan: Barangdalamproses – Dep.Perakitan24.960 Barangdalamproses – Dep.Pemotongan 24.960 Jurnaluntukmencatat transfer biayadari Dep. Pemotonganke Dep. Perakitan: Barangjadi54.159 Barangdalamproses – Dep.Perakitan 54.159