SPP Deployment Plan. John DeHart and Jon Turner Applied Research Lab, Washington University www.arl.wustl.edu /~ jdd. SPP Deployment Locations. 1 GbE connections. KANSas City. SALT Lake City. WASHington DC. 3. 3. 1. 1. 2. 2. 4. 4. 1. 3. 5. 6. 2. 4.
E N D
SPP Deployment Plan John DeHart and Jon TurnerApplied Research Lab, Washington Universitywww.arl.wustl.edu/~jdd
SPP Deployment Locations 1 GbEconnections KANSas City SALT Lake City WASHington DC 3 3 1 1 2 2 4 4 1 3 5 6 2 4 planned extension toinitial deployment ATLAnta HOUSton 2 4 5 5 1 3 4 2 3 1
SALT Configuration 1 Gb/s each private IPaddresses GbE Switch (Proto-GENI) SPP Optical Network 10Gb/s 1234 connectionto CP (10/100)public IP LC portscopper connections 8 9 10 public IPaddresses 1 Gb/s each GbE Switch (I2) Router (I2) 10Gb/s
WASH Configuration (same as SALT) 1 Gb/s each private IPaddresses GbE Switch (Proto-GENI) SPP Optical Network 10Gb/s 1234 connectionto CP (10/100)public IP LC portscopper connections 8 9 10 public IPaddresses 1 Gb/s each GbE Switch (I2) Router (I2) 10Gb/s
KANS Configuration 1 Gb/s each private IPaddresses GbE Switch (Proto-GENI) SPP 123456 10Gb/s Optical Network connectionto CP (10/100)public IP 8 9 10 LC portscopper connections public IPaddresses 1 Gb/s each GbE Switch (I2) Router (I2) 10Gb/s
3 Month Priorities • Deployment by July 1. • ProtoGENI folks are deploying at same time. • Configure for Deployment and Exercise • Rename three nodes (John and Dave) • Configure exactly as will be when deployed (John and Dave) • Code option for Games Application (Ritun) • Without taking up much if any of John or Fred’s time. • In Progress : Other people using SPPs (Ken, Ritun) • Re-do SPP3: hub and GPE boot sequence (Dave) • Boot sequence (srm, scd, rmp, natd, …) (John and Fred) • Sharing things like sliced, SPPMon, etc. Should they go in the ref. file system give to each slice? (John) • Bug Fixes • DONE: Filter API calls (Mart) • Flow Control (Dave) (but not necessarily for July 1) • DONE: NM/RMP timing (John and Fred) • DONE: Verify removing a slice cleans up correctly (John) • DONE: First ICMP NAT connection fails. NAT initialization file had ICMP start ID of 0, should be 1. (John, Mart) • In Progress: Reservations (Fred) • Security Holes (Fred) • In Progress: Flowstats (John) • In Progress: FSD • DONE: SCD • SRM • NATD • DONE: Updates to ME FlowStats: add TimeRecord, add Command to FlowRecord and TimeRecord • Change SubstrateOnly Lookup to NPE Bypass Lookup (John) • Power Control for remote reboot capability (Dave) • Documentation (Ken) • Plan for software upgrades and version control (John) • Detailed installation instructions and diagram (Dave) • SPP PLC: Any changes needed? Open up to outside WU. • EIT doing backups of SPP PLC • PLC Admin email for new user requests
Not Priorities • NPE V2 • Mike can keep working on it but should not distract the rest of us. • GEC-5 (mid-July) Demo • Geniwrapper and RSPecs • Its not ready for us anyway… • Openflow code option and demonstration • Nick McKeown wants to hold off until GEC-6 also.